My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-09-11 CC Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2002
>
2002-09-11 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2009 8:01:18 AM
Creation date
5/13/2009 7:59:52 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COUNTY STATE AID HIGHWAY 8/14 <br />SUMMARY OF COMMENTS RECEIVED FROM THE PUBLIC AND <br />RESPONSES TO THE COMMENTS <br /> <br />Washington County, Anoka County, the Cities of Hugo and Lino Lakes, along with their <br />consultant TKDA, are conducting a study ofthe County State Aid Highway (CSAR) 8/14 <br />corridor between Interstate 35E (I-35E) and Trunk Highway 61 (TH 61). <br /> <br />Four alignment alternatives will be analyzed in the project's preliminary design phase: <br /> <br />140th Street Alignment: Realigning CSAH 8 to connect with TH 61 at l40th Street <br /> <br />l42nd Street Alignment: Realigning CSAH 8 to connect with TH 61 between l40'h Street <br />and existing CSAH 8 <br /> <br />14Sth Street Alignment (Existing): Maintaining the CSAH 8 alignment along its existing <br />location <br /> <br />147'h Street Alignment: Realigning CSAH 8 to connect with TH 61 at l47'h Street <br /> <br />THE FOLLOWING COMMENTS HAVE BEEN RECEIVED REGARDING ROADWAY <br />ALIGNMENT ALTERNATIVES: <br /> <br />. 140th Street Alignment: <br /> <br />The alignment will create floodplain impacts and would require a DNR permit if the <br />alignment crosses Clearwater Creek. <br /> <br />Traffic will be divertedfrom downtown businesses. <br /> <br />Realigning the roadway to the south doesn't make sense since the majority of the traffic on <br />CSAH 8 travels north on TH 61. <br /> <br />A roadway along this alignment would intersect a popular recreational path that runs along <br />Fenway Avenue. <br /> <br />The alignment will impact the residential and commercial developments along 14dh Street. <br /> <br />The 14dh alignment should be constructed because it would provide access to the industrial <br />park south of 14dh Street. <br /> <br />The 14dh Street alignment is impractical. <br /> <br />The 14dh Street alignment is the most logical choice because the Hugo Fire Hall response <br />team members will have easy and fast access, the industrial area south of 14dh Street will <br />have access to the freeway, and there are sidewalks in place in front of the Fire Hall. <br /> <br />CSAH 8/14 COMMENTS AND RESPONSES - Updated July 2002 <br /> <br />- 1 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.