Laserfiche WebLink
<br />Draft <br /> <br />SITE PLAN REVIEW CHECKLIST <br /> <br />The following items need to be submitted to and reviewed by City Staff. It is advised <br />that early in the plHnnine process, potential developers request a joint meeting with the <br />City Administrator, Building OfficiaI/Public Works Director, City Engineer and Fire <br />Chief so that early communication can occur to relay expectations and timelines for the <br />review process. <br /> <br />Information needs to be submitted for staff review at least two weeks prior to the date of <br />notice for the public hearing to be held at the Planning and Zoning Commission. <br /> <br />YES ID! <br /> <br />ZONING CORRECT <br /> <br />MEETS MINIMUM BUILDING SIZE <br /> <br />MEETS SETBACK REQUIREMENTS <br />APPROVED USE IN ZONING DISTRICT <br /> <br />BOUNDARY SURVEY OF PARCEL INCLUDING <br />IDENTIFICATION OF ALL MONUMENTS <br /> <br />SCALED LOCATION OF ALL BUILDINGS, STRUCTURES, <br />DRIVEWAYS, SIDEWALKS, TRAILS, DETERMINATION <br />OF NUMBER OF PARKING STALLS AND CURBING <br /> <br />SCALED LOCATIONS OF ALL EXISTING AND PROPOSED <br />UTILITIES AND EASEMENTS <br /> <br />SCALED DEPICTIONS OF FLOOR PLANS FOR EACH <br />STORY <br /> <br />SCALED DEPICTIONS OF EACH BUILDING ELEVATION <br />AND DESCRIPTIONS OF EXTERIOR BUILDING <br />MATERIALS AND COLOR SCHEMES <br /> <br />SCALED SITE GRADING PLANS, INCLUDING EROSION <br />AND SEDIMENTATION CONTROL MECHANISMS AND <br />PROCEDURES <br />