My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-01-12 Handouts
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2005
>
2005-01-12 Handouts
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2009 9:33:52 AM
Creation date
7/21/2009 9:31:45 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 0.0 Organize the effort <br />Prior to undertaking any investigations or preparing any plans, the HKGi <br />team will request that all available information related to the project and <br />the project area be provided to our team so that we develop a clear <br />understanding of any work or investigations that have been completed to <br />date. We will also begin the process of compiling base information and <br />mapping, so that any information contained in the map might be efficiently <br />verified during our first visit to the community. Base map data will likely <br />need to come from Anoka County and the City's consulting engineers <br />(BRAA.) <br /> <br />In order to facilitate the project with a complete understanding of the <br />process for involving stakeholders; the role and responsibilities of the <br />Steering Committee and city staff; schedules for the work; communication <br />processes (focusing On communication with the community and affected <br />property owners); and the need to fully understand the needs of the city as <br />changes occur to Main Street (County Road 1+), we will meet with the <br />Steering Committee to review the project and agree upon the approach to <br />the work. The purpose of this task is to clarify intentions and roles at the <br />outset of the project, rather than having to refocus or redirect efforts once <br />work has begun. A meeting with the Steering Committee will be held as a <br />"kick-off" to the project. <br /> <br />Tasks: <br />0.1 <br /> <br />Request all background information for the project area from the <br />City of Centerville, including but not limited to current zoning <br />designations and related ordinances, comprehensive plan <br />designations and all sections relating to downtown and <br />transportation, past plans impacting the project area, building <br />condition assessments, property ownership records and property <br />values (from Anoka County GIS data), prome information for the <br />proposed roadway (CR 1 +--in order to better understand the <br />impacts on remaining parcels and access opportunities) current <br />and forecasted traffic volumes. <br />Assemble base map information from available data provided by <br />the City of Centerville, its consultants or Anoka County, including <br />but not limited to property boundaries, building locations, <br />contours, other physical features, existing and proposed roadway <br />alignments, existing and proposed utility locations, and current <br />aerial photography; to the extent that this information can be <br />provided in digital formats, the resulting map mapping can be <br />more effectively used in the planning process. We will rely on <br /> <br />0.2 <br /> <br />Hoisington Koegler Group Inc. <br /> <br />11I13 <br />~n <br /> <br />page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.