Laserfiche WebLink
<br />the proposed roadway, current and forecasted traffic volumes. <br /> <br />0.2 Assemble base mapping from available data including but not <br />limited to property boundaries, building locations, contours, other <br />physical features, existing and proposed roadway alignments, <br />existing and proposed utility locations, and current aerial <br />photography; to the extent that this information can be provided <br />in digital formats, the resulting map can be more effectively used <br />in the planning process. We will rely on available aerial photography <br />as provided by the best source. <br /> <br />0.3 Summarize background data andmeet with Staff to verilY data and identifY <br />gaps. <br />0.4 Conducta"Kick-Off"Meetingwiththe Steering Committee to review tasks, <br />outcomes, roles, responsibilities and schedule; and to discuss other points <br />thatwill affect the success or outcomes of the project. <br /> <br />Task 1.0 Identify what exists <br />The creation of the Redevelopment Plan should he rooted in what is appropriate to <br />Centerville---- nota set of directions imposed without regard for its unique character <br />and qualities. Centervillehasmuch to draw from: a strong and compelling plan for <br />this part of downtown shouldbave a way of reflecting the character of the town and <br />the desires of its people, and the opportunities that might be afforded by the <br />realignment of CR 14. HKGi will establish the local influences for design and <br />development character ~ a process that will lead to a plan that reinforces local <br />qualities and opportunities ~ and will define the functional character that will be <br />necessary to support development within the project area. The catalyzing event for <br />this project is the proposed improvements and redesign of CR 14, the HKGi team <br />will be particularly observant regarding key transportation characteristics. <br /> <br />The redevelopment area does not exist in a vacuum. ft is located near a major <br />regional park and open space amenity and is directly connected to the regional <br />freeway system. A part of our investigations will include the pursuit of information <br />for concerns or opportunities that lie beyond the particular bounds of the project <br />area. It is our experience that the work of investigating the community might best <br />begin with a tour lead by "local experts." While we will be gathering quantitative <br />information about the project area, the tour provides us withan opportunity to hear <br />anecdotal information ~ which often is more interesting and to the point than <br />what we find in our research <br /> <br />It will also be importantin this stage of the work to examine the potential of various <br />types of development. An overview will be provided that addresses the likelihood of <br /> <br />liJsk OOeliveT<lbles: <br /> <br />. complied base mapping for project area <br />and summary of key points relating to the <br />project area from background information <br />provided by the City of Centerville <br /> <br />. agreement on work tasks, deliverable< and <br />project schedule <br /> <br />. Steering Committee Meeting #1 <br /> <br />Hoisington Koegler Group Inc. <br /> <br />11113 <br />lOO <br /> <br />page 10 <br />