My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-09-23 Hatem Q
Centerville
>
City Council
>
Minutes
>
2000-2009
>
2009
>
Open Forum
>
2009-09-23 Hatem Q
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2009 9:49:27 AM
Creation date
10/9/2009 9:49:27 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />2335 Highway 36 W <br />SI. Paul. MN SS113 <br /> <br />Tel 651-636-4600 <br />Fax 651-636-1311 <br /> <br />www.bonestroo.com <br /> <br />June II, 2008 <br /> <br />.. Bonestroo <br /> <br />Dallas Laf50ll <br />Administrator <br />City of Centerville <br />1880 Main Street <br />Centerville, MN 55038 <br /> <br />Re: 2009 Street and Utility Improvements <br />Engineering Scope and Fee Proposal <br />City of Centerville <br />Bonestroo File No.: 000616-7158-0 <br /> <br />Dear Dallas: <br /> <br />Thus far, we have submitted two short letter proposals which were subsequently approved by !he City <br />Cound!. The first authorized us to complete a Feasibility Report, the second authorized the Preliminary <br />Survey and some initial design work. Those three tasks have been completed. Additionally, we have done <br />some work ancillary to these tasks as changes in the project scope have developed induding exploration <br />and associated cost estimating for: the abandonment of lift Station 3, inclusion of water services between <br />the curb box and home, and well abanadonment. We have also prepared for, attended and performed <br />follow-up tasks for numerous public open houses, on-site neighborhood resident meetings, Council <br />workshops and offidal City Coundl meetings relating to the project <br /> <br />Having now refined the scope of this project to something with which the council is comfortable, it may be <br />appropriate to authorize the preparation of plans and specifications along with some other pre-bid work. <br />This letter is to serve as the scope and fee proposal for that work as described herein. If the Council wishes, <br />they could also authorize the advertisement for bids, or they could wait for that action until after the plans <br />have been prepared and approved. <br /> <br />~ <br />The scope of the work leading up to the bid is divided into several categories. <br /> <br />SI. Paul <br />SI. Cloud <br />Roche51er <br />Milwaukee <br />Chicago <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.