My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-12-20 Packet
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
1999
>
1999-12-20 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2009 9:40:03 AM
Creation date
12/22/2009 9:39:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUNDING <br /> Costs for the new water main and service lines to existing buildings will be assessed to all <br /> properties abutting Centerville Road between Westview Street and Chauncey Barett <br /> Gardens. Several assessment options, either by front foot or per lot, are provided in <br /> Appendix B. As a policy in the past, the City has contributed monies to fund a <br /> percentage of new water main construction in fully developed areas. In this case, the <br /> City will pay the additional cost for 8" diameter main vs. 6" main (trunk cost). In <br /> addition, to keep assessments at an amount considered equal to the benefit, the City will <br /> cover 25% of the remaining water main costs. <br /> For informational purposes, it is pointed out that each parcel is subject to connection <br /> charges. For new water main along Centerville Road, connection fees are $1,300 per <br /> residential equivalent unit (REU). <br /> The total estimated cost for streetscape improvements is $157,036.42. It is assumed that <br /> the City will fund the amount through grants, TIF monies, and special accounts. The <br /> following shows the City's financial commitment to this project. <br /> Trunk Water Main $10,913.17 <br /> 25% of Water Main Improvements 49,587.04 <br /> Streetscape Improvements 157,036.42 <br /> Total City Cost $217,536.63 <br /> Assessments: Appendix B shows the estimated assessment amounts for each property. <br /> The total length of assessable front footage from Westview to Chauncey Barett is 2,085 <br /> feet. There are 21 separate property owners (7 commercial and 14 single family <br /> residential). Front footage distances for residential lots vary from 43' to 160'. Several <br /> options are shown using combinations of front footage and per lot basis. The following <br /> calculation shows how the total assessable cost was determined. <br /> Total Water Main Cost $209,261.32 <br /> Trunk Cost: $7,995.00 x 1.05 x 1.30 (10,913.17) <br /> Subtotal $198,348.15 <br /> City Share of Improvement: Assume 25% (49,587.04) <br /> Total Assessable Cost $148,761.11 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.