My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-03 Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
1999 Agendas
>
Packets
>
1999-03 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2009 12:34:24 PM
Creation date
12/22/2009 12:34:12 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6) See number 5. <br /> 7) See number 5. <br /> 8) Services will be provided according to the preliminary utility plan (and City of Centerville <br /> review). Sanitary sewer and water main connections are available approximately 200 feet <br /> south of the proposed PUD. Extension of these services northerly to our site and along Deer <br /> Pass Drive should provide an orderly progression for the city's infrastureture improvements. <br /> US West telephone service is available adjacent the PUD along 20 Avenue North as is <br /> electric service via an overhead line by Connexus Engery. Gas service by Minnegasco is <br /> available on the East side of 20 Avenue North. <br /> 9) Soil borings have been scheduled and a report will follow from Braun Engineering. <br /> 10) The PUD will consist of 15 single family lots on 436,765 sq.ft. (10.03 acres). <br /> A) Area devoted to driveways and houses is 54,065 sq.ft. (1.24 acres). <br /> B) House types included in the above calculation are all walkout, split entry walkout or <br /> lookout lots together with the driveways is 54,065 sq.ft. (1.24 acres) <br /> C) Green space covers 350,000 sq.ft. (8.03 acres). This will not be classified as common <br /> open space: The open space will be held individually by land owners and be covered <br /> with the necessary easements to ensure protection of the existing and proposed wetland <br /> area. <br /> D) No area is devoted to public open space. <br /> E) Street areas: <br /> I) 20 Ave. N.: ROW = 33,000 sq.ft. (0.75 acres) Paved area = 13,200 sq.ft.(0.30 acres). <br /> 2) Deer Pass Dr: ROW = 43,563 sq.ft.(1.0 acres) Paved area = 19,500 sq.ft. (0.45 acres). <br /> F) No additional off street parking is provided as all lots will have garages and driveways. <br /> G) No commercial uses are included in this PUD. <br /> H) No office or industrial uses are included in this PUD. <br /> 11) One Phase construction. <br /> 12) Open spaces are held by individuals and DNR Wetland No. 545W falls under the jurisdiction <br /> of the Minnesota Department of Natural Resources. <br /> 13) Restrictive covenants will be limited to drainage, utility, ponding and flowage easements over <br /> the wetlands as shown on the preliminary plat. <br /> 14) Schematic Utilities plan shown on Preliminary Utility Plan. <br /> 15) Additional comments: <br /> A) Although several exemptions from the R -5 zoning requirements for setback, lot width <br /> and area have been requested we are attempting to create a high end subdivision which <br /> complies with the goals of R -5 zoning. <br /> B) The proposed development is adjacent to CENTER HILLS 2 AND 3 ADDITIONS <br /> both are R -2 zoning. Hence DEER PASS would be a logical progression for residential <br /> development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.