My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-03-31 Minutes of the Park & Pedestrian System Comp. Plan Mtg.
Centerville
>
Committees
>
Parks & Rec.
>
Minutes
>
1985-2022
>
1993
>
Minutes
>
1990-03-31 Minutes of the Park & Pedestrian System Comp. Plan Mtg.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2010 10:09:28 AM
Creation date
1/7/2010 10:09:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In order to better position the City for upcoming grant opportunities the City <br /> must produce this document within a minimum time frame. To proceed <br /> expeditiously and contain costs, we offer the following matrix of tasks, <br /> responsible parties and anticipated time frames. <br /> TASK f:1TY STAFF (hours) MSA ($) 7.OFF PFT TON <br /> ID existing properties x x x <br /> ID potential properties x x <br /> ID other pub. properties x x <br /> Compile existing ord, <br /> plans, etc. (D) x <br /> Develop concept plan x x <br /> Develop preliminary plan x x <br /> Develop final plan x x <br /> Develop cost data x x <br /> Develop grant data x x x <br /> ID coop projects x x <br /> Compile standards,etc. x x <br /> Produce plan graphics x x <br /> Produce text x x <br /> Hold public bearing x x x <br /> Compile final report x x x <br /> Schedule Week 1 2 3 4 5 6 7 8 1 <br /> ID existing properties x <br /> ID potential properties x <br /> ID other pub. properties x <br /> Compile existing ord, x x <br /> plans, etc. (D) <br /> Develop concept plan x(present at cc mtg. w/ p&r, p&z, cedtt) I <br /> Develop preliminary plan x(present at cc mtg. etc. etc.) <br /> Develop final play x(present) I <br /> Develop cost data x x x x x <br /> Develop grant data x x x x <br /> ID coop projects x x x x x <br /> Compile standards,etc. x x x <br /> Produce plan graphics continual <br /> Produce text continual <br /> Hold public hearing x <br /> Compile final report x x <br /> We recommend that a steering committee be formed to oversee and expidite the <br /> project. Potentially the steering committe would indude one Councilmember, <br /> one Park and Recreation member, one dty staff person, John Stewart (or <br /> assigned), and be headed by Carol Zoff Pelton. These members will be <br /> responsible for the majority of the actual work of producing the document. In <br /> addition, they will be responsible for keeping their respective council/ <br /> committee - members informed of our work and the steering committee of their <br /> feedback. <br />
The URL can be used to link to this page
Your browser does not support the video tag.