Laserfiche WebLink
ru c u1 L <br /> Centerville staff are going to meet with the interconnect installer next week. <br /> There is a meeting at 2 :00 next week Monday at the RCWD <br /> offices in Arden Hills. The <br /> meeting is to discuss the proposed addition of a low flow culvert under I -35E that would <br /> discharge into Clearwater Creek. This project is to assist upstream property owners in their <br /> future development efforts. The supporting study that was sent to the City in regards to this <br /> project is a compilation of highly technical data and jargon produced from a hydraulic <br /> modeling study by the RCWD district engineers. I expressed concern about this report to <br /> our engineering firm and the proposed downstream impact to Centerville. I am very <br /> impressed by the written response forwarded to the RCWD from the water resource <br /> specialist Dan Edgerton from our engineering firm. Mr. Edgerton created two pages of <br /> specific questions that he wants answered by the RCWD engineers. I was told by Kate <br /> Drewry (RCWD Administrator) that the impact to Centerville would only occur in low flow <br /> scenarios. I will attend this meeting along with Paul Palzer. We will report back our <br /> findings. This meeting is being held prior to formal public hearings on the proposed <br /> project. <br /> * Enjoy your weekend! <br /> 5/19/00 <br />