Laserfiche WebLink
Bonestroo, Rosene, Anderlik and Associates, lnc. is an Affirmahve Action/fqual Opportunity Employer <br /> I . BOnestr�� Principals: Otro G. Bonestroo, P.E. • Josepn C. Anderlik, P.E � Marvin L Sorvala, P.E. • <br /> � Richa�d E. Twner, P.E. • Glenn R. Cook, PE. • Robert G. Schunicht, P.E. • Jerry A. Bourdon, P.E. • <br /> i �,\OS��G Robert W. Rosene, P.E. and Susan M. Eberlin, C.P.A., Senior Consultants <br /> „ s Assocrafe P�rncipals Howard A. Sanford, PE. • Keith A. Gordon, FE. • Robert R. Pfefferle, P.E. • <br /> I At ,der'��\ & Richard W. Fosrer, P.E. • David O. Losko[a, P.E. • Robert C Russek, A.I.A. • Mark A. Hanson, P.E. • <br /> Pdichael T. Rau[mann, P.E. • Ted K.Field, P.E. • Kenneth P. Anderson, P.E. • Mark R. Rolfs, PE. � <br /> A ssoeiates Al Rc S d pE E, L.S. • Robert E Kotsmi[h • Agnes M Ring • Michael P Rau, PE • <br /> Engineers & Aret�iteets Offices: St. Paul, Rochester, Wilirnar and St. Cioud, MN • Milwaukee, WI <br /> Website: www.bonesiroo.com <br /> January 12, 1999 <br /> Honorable Mayor and City Council <br /> City of Centerville <br /> 1880 Main Street <br /> Centerville, MN 55038 <br /> Re: City Project Update <br /> BRA File No. 616-98-000 <br /> Dear Council Members: <br /> We have completed a list of past, current, and future projects to keep current and new members I <br /> informed. See the attached City map for number reference to each project. I <br /> � � � 1) Flashing Crosswalk Li�hts <br /> Located on CSAH 14 at Progress Road, two flashing yellow lights are being installed to <br /> warn traffic and slow vehicles near the school crossing. <br /> Current Project Status: Pouring conerete bases for the poles, installing wiring. I <br /> Remaining Issues: Lights will be operational by January 29, 1999. Restoration of the I <br /> boulevards will take place in the spring, including a raised concrete curb median around I <br /> the pole in Kelly's parking lot. i <br /> 2) LaMotte Park <br /> Regraded the entire park to improve drainage, added a third softball field, and provided <br /> other amenities. Work took place in the fall of 199�. <br /> Current Project Status: AIl work is complete for the winter, except softball infield agline <br /> and lighting. <br /> Remaining Issz�es: Work with NSP to install three (3) lights around the parking lot, <br /> monitor seed growth in the spring. Possibly curb and pave the parking 1ot in 1999. <br /> 3) Clearwater Meadows <br /> Located south of Main Street, between,20` Avenue and Brian Drive, this subdivision was <br /> constructed in 1996. <br /> Current P�°oject Status: Project complete. <br /> cor616-GENCityProjectUpdate. doc <br /> 2335 West Highw�y 3G � St. f'aul, MN 55]13 ■ G12-G3G-4G00 ■ Fax: G12-G3G-13�1 <br />