Bonestroo, Rosene, Anderlik and Associates, lnc. is an Affirmahve Action/fqual Opportunity Employer
<br /> I . BOnestr�� Principals: Otro G. Bonestroo, P.E. • Josepn C. Anderlik, P.E � Marvin L Sorvala, P.E. •
<br /> � Richa�d E. Twner, P.E. • Glenn R. Cook, PE. • Robert G. Schunicht, P.E. • Jerry A. Bourdon, P.E. •
<br /> i �,\OS��G Robert W. Rosene, P.E. and Susan M. Eberlin, C.P.A., Senior Consultants
<br /> „ s Assocrafe P�rncipals Howard A. Sanford, PE. • Keith A. Gordon, FE. • Robert R. Pfefferle, P.E. •
<br /> I At ,der'��\ & Richard W. Fosrer, P.E. • David O. Losko[a, P.E. • Robert C Russek, A.I.A. • Mark A. Hanson, P.E. •
<br /> Pdichael T. Rau[mann, P.E. • Ted K.Field, P.E. • Kenneth P. Anderson, P.E. • Mark R. Rolfs, PE. �
<br /> A ssoeiates Al Rc S d pE E, L.S. • Robert E Kotsmi[h • Agnes M Ring • Michael P Rau, PE •
<br /> Engineers & Aret�iteets Offices: St. Paul, Rochester, Wilirnar and St. Cioud, MN • Milwaukee, WI
<br /> Website: www.bonesiroo.com
<br /> January 12, 1999
<br /> Honorable Mayor and City Council
<br /> City of Centerville
<br /> 1880 Main Street
<br /> Centerville, MN 55038
<br /> Re: City Project Update
<br /> BRA File No. 616-98-000
<br /> Dear Council Members:
<br /> We have completed a list of past, current, and future projects to keep current and new members I
<br /> informed. See the attached City map for number reference to each project. I
<br /> � � � 1) Flashing Crosswalk Li�hts
<br /> Located on CSAH 14 at Progress Road, two flashing yellow lights are being installed to
<br /> warn traffic and slow vehicles near the school crossing.
<br /> Current Project Status: Pouring conerete bases for the poles, installing wiring. I
<br /> Remaining Issues: Lights will be operational by January 29, 1999. Restoration of the I
<br /> boulevards will take place in the spring, including a raised concrete curb median around I
<br /> the pole in Kelly's parking lot. i
<br /> 2) LaMotte Park
<br /> Regraded the entire park to improve drainage, added a third softball field, and provided
<br /> other amenities. Work took place in the fall of 199�.
<br /> Current Project Status: AIl work is complete for the winter, except softball infield agline
<br /> and lighting.
<br /> Remaining Issz�es: Work with NSP to install three (3) lights around the parking lot,
<br /> monitor seed growth in the spring. Possibly curb and pave the parking 1ot in 1999.
<br /> 3) Clearwater Meadows
<br /> Located south of Main Street, between,20` Avenue and Brian Drive, this subdivision was
<br /> constructed in 1996.
<br /> Current P�°oject Status: Project complete.
<br /> cor616-GENCityProjectUpdate. doc