Council Members <br /> City of Centerville <br /> January 12, 1999 <br /> Page 2 <br /> Remaining Issues: Miscellaneous punch list items, letter of credit issue with <br /> developer. <br /> 4) The Woods of Clearwater Creek <br /> 10-lot subdivision constructed in 1998, developed by Dick Travis included public street <br /> (Brian Drive), sidewalks-trails, sanitary and storm sewer and water main. <br /> Cu�rent Project Status: The project is completed for the season with the curbing, <br /> bituminous base course, water main and sanitary sewer in-place. The site grading is <br /> com.pleted with the exception of the existing ditch/pond along the west plat line to be fine <br /> graded. <br /> Remaining Issues: All issues have been addressed and waiting springtime construction <br /> season to complete the development. A dike will be constructed across the ditch and <br /> storm sewer piping constructed below it. The sidewalk and trail ways wi11 then be <br /> completed and the final layer of asphalt. Anticipated project completion is July l 1999. <br /> 5) Center Villa ! <br /> Located on the west side of 20`" Avenue, at the south end of Brian Drive, this residential <br /> subdivision consists of 221ots. <br /> I <br /> Current Project Status: Preliminary plat has been approved, utility plans and i <br /> specifications are complete, no construction has taken place to-date. <br /> Remaining Issues: Receive schedules from Willie Lessard for site grading, utility <br /> installation, street construction, etc. for the spring of 1999. <br /> 6) Buechler Estates <br /> This 5-lot subdivision is located on the north shore of Centerville Lake, at the far west <br /> end of Mound Trail. <br /> Current Project Status: Preliminary plat has been approved, sanitary sewer/street plans <br /> are complete. Project is on hold till spring. <br /> Remaining Issues: Receive schedule from Carl Buechler for site grading, sewer <br /> construction, and street reconstruction. <br /> 7) Acorn Creek <br /> 21-lot subdivision constructed in 1995, developed by Gerald Rehbein included public <br /> streets, sidewalks-trails, sanitary and storm sewer and water main. <br /> Current Project Status: Project is completed. All lots have been built upon with the last <br /> � house nearing completion. <br /> cor616-GEN C ityProj ectUpdate.doc <br />