My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-04 P & R Agenda Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2010
>
2010-08-04 P & R Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2010 11:14:05 AM
Creation date
7/30/2010 3:34:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Centerville Page 2 <br /> TE Trail Grant 7/29/10 <br /> Value Engineering <br /> While some materials may be preferable; others may still be acceptable. We have looked at <br /> ways to trim costs by using less costly materials. These material substitutions are shown below: <br /> Item Substitute Unit Qty. Unit $ Savings <br /> SELECT GRANULAR BORROW (CV) GRANULAR BORROW CU YD 1964 -$5.00 - $9,820.00 <br /> DRAINAGE STRUCTURE "T" STYLE INLET EACH 44 - $300.00 - $13,200.00 <br /> SANDBLASTED CONCRETE STANDARD CONCRETE SQ FT 171 -$3.10 - $530.10 <br /> COLORED CONCRETE STANDARD CONCRETE SQ FT 935 -$2.30 - $2,150.50 <br /> STEEL LANDSCAPE EDGER PLASTIC EDGER LIN FT 350 -$1.40 - $490.00 <br /> DECIDUOUS TREE 2.5" CAL B&B 1.5" CALLIPER TREE 16 - $135.00 - $2,160.00 <br /> DECIDUOUS SHRUB NO 5 CONT NO, 1 CONT SHRUB 67 - $17.00 - $1,139.00 <br /> PERENNIAL NO 1 CONT 4" CONT PLANT 307 -$7.00 - $2,149.00 <br /> SODDING TYPE LAWN SEED /HYDROMULCH SQ YD 4325 -$2.09 - $9,069.40 <br /> 4" SOLID LINE WHITE -EPDXY LATEX PAINT UN FT 2670 -$0.50 - $1,335.00 <br /> CROSSWALK MARKING -EPDXY LATEX PAINT S• FT 900 - 3.00 - 2 700.00 <br /> Total Value Engineering Savings $44,743.00 <br /> Additional Alternates <br /> The original bid included four (4) alternates. They were: 1— Kiosk, 2 — Boulevard Lights, 3 — <br /> Boulevard Trees, 4 — Pergola. The low bidder's total on these items was around $65,000. With <br /> these altemates off the bid, the total base bid was still around $1.3 Million; well over the <br /> budgeted amount of around $1.0 M. The idea behind adding additional alternates would be to <br /> have enough value in the alternates to allow the City to make an award of the base bid, even if <br /> prices came back around the same overall. The proposed alternates are as listed below. We <br /> estimate that these items would be enough to have the base bid come in around the budgeted <br /> amount of $1.0 M if bid prices came in the same as the first bid. <br /> Alt. 1 Park Amenities (Bike Racks, Drinking Fount., Sprinkler Syst., Trash Rcptcl., Benches) <br /> Alt. 2 Alternate Kiosk Location (See attached sketch) <br /> Alt. 3 Fountain <br /> Alt. 4 North Park (bump out w /Benches), Boulevard Lights & Trees on CSAH 14 <br /> Alt. 5 Pergola <br /> The alternates are in reverse order of importance. In other words, Alternate 5 would be the first <br /> to be cut from the budget; Alternate 1, would be the last. <br />
The URL can be used to link to this page
Your browser does not support the video tag.