Laserfiche WebLink
<br />following method. The resulting assessment will be known as a <br />lateral benefit assessment. <br /> <br />a. Front Footage Basis <br />Determine the total assessable front footage of all lots <br />and equivalent lot units receiving lateral benefit and <br />divide the project cost by the total of assessable front <br />footage. Each lot or equivalent lot unit assessment is <br />equal to the total assessable front footage per unit <br />multiplied by the front footage assessment rate. <br /> <br />4. Building Service <br />The assessment rate for each size of building service (4, 6 or 8 <br />inch) shall be determined by adding all the costs associated with <br />each size of service and dividing by the total number of services <br />constructed. Each unit will be assessed at the determined rate <br />for each size and number of services installed. This will be <br />known as the building service assessment. <br /> <br />10 <br />