My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Adopted Assessment Manual
Centerville
>
City Council
>
Agenda Packets
>
1996-2022
>
2010
>
Adopted Assessment Manual
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 9:59:04 AM
Creation date
10/8/2010 11:16:13 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />following method. The resulting assessment will be known as a <br />lateral benefit assessment. <br /> <br />a. Front Footage Basis <br />Determine the total assessable front footage of all lots <br />and equivalent lot units receiving lateral benefit and <br />divide the project cost by the total of assessable front <br />footage. Each lot or equivalent lot unit assessment is <br />equal to the total assessable front footage per unit <br />multiplied by the front footage assessment rate. <br /> <br />4. Building Service <br />The assessment rate for each size of building service (4, 6 or 8 <br />inch) shall be determined by adding all the costs associated with <br />each size of service and dividing by the total number of services <br />constructed. Each unit will be assessed at the determined rate <br />for each size and number of services installed. This will be <br />known as the building service assessment. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.