My WebLink
|
Help
|
About
|
Sign Out
Home
1994 07-18 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
1990 - 1999
>
1994
>
1994 07-18 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2026 8:59:47 AM
Creation date
6/19/2019 10:47:06 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET CITY COUNCIL
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
Show annotations
View images
View plain text
OFF -ROAD ESTIMATED TRAIL COST (Continued) <br />BITUMINOUS <br />STREET FOOTAGE DOLLARS* <br />C9 Highway 96 South Side: <br />White Bear to Shoreview 13,200 73,920 <br />C10 Labore Road: Between West Bridge 217 684 <br />Decks (4.5 feet wide) <br />C 11 McMenemy Street: <br />Hwy. 96 to County Road F 5,187 29,047 <br />County Road F to Koehler Road 3,918 21,941 <br />C12 Stockdale Right of Way to Centerville Rd: 1,139 6,378 <br />D13 Edgerton Right of Way: <br />Stockdale to County Road F <br />D14 North Oak Drive/Clover Ave: <br />North Oak Drive to Thornhill Lane <br />2,447 13,703 <br />488 2,733 <br />E15 Meadowood Lane: Cul de sac to Lily Pond Trail 467 <br />Commerce Court: Commerce Court to Westfield <br />Lane 245 <br />2,615 <br />1,372 <br />E16 Thornhill Lane: <br />Greenhaven to Heritage 1,244 6,966 <br />Heritage to County Road: F 1,630 9,128 <br />E17 Vadnais Boulevard: <br />Edgerton Street to Little Canada. Line 2,95916,570 <br />E18 Wolters. Boulevard: <br />Lahore Road to Highway 61 <br />4,207 23,559 <br />F19 Community Park Trail: 3200 17,920 <br />Boardwalk section 950 unknown <br />F20 Labore Rd Extension to White <br />Bear Parkway: 2,984 16,710 <br />15 May.5, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.