My WebLink
|
Help
|
About
|
Sign Out
Home
2019 08-06 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2019
>
2019 08-06 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:31:26 PM
Creation date
1/5/2026 9:10:38 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PC MEETING
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
Show annotations
View images
View plain text
MEMORANDUM <br />TO: PLANNING COMMISSION <br />FROM: TOM RIEDESEL <br />DATE.: SEPTEMBE 018 <br />I <br />SUBJECT: CONSTRUCTION OF A WAREHOUSE <br />REQUEST: CONDITIONAL USE PERMIT <br />VARIANCES FROM SECTION 9'10.T0 AND 26.4,E OF THE <br />CONSOLIDATED LAND USE ORDINANCE OR CONSOLIDATED <br />LAND USE ORDIANCE AMENDMENT <br />LOCATION: 3660 SCHEUNEMAN ROAD <br />APPLICANT: SMITTY JEFFREY aF JEFFREY ENTERPRISES,. LLC <br />FOR POLAR TOOL <br />ZONING: GATEWAY ZONE - NEIGHTBORHOOID CENTER <br />Polar Tool is requesting City of. Gem Lake approval to construct a storage warehouse <br />at. 3660 Scheuneman Road. Polar recently purchased the .site and removed the <br />dilapidated home, which was located on the property. Their current office/warehouse <br />building is on the abutting property ,at 3642 Scheuneman Road. <br />The n..ew building is proposed to be 60' x 80' in. size with one loading dock and one <br />drive- in door facing Scheuneman Road. The .building as proposed is a post frame <br />building using corrugated metal siding. A 3' high brick detail. has been added to the <br />right=of-way side of the bu€Iding. sim1larto the fa9ade on their existing building. A. paved <br />driveway, which in the original proposa.I was 66' wide, has been reduced in width to 34'. <br />The building is proposed to be 28' High measured from grade to the tip of the roof, A <br />4:12 pitched. roof and one -foot overhangs are proposed. <br />The previous staff merno requested plan updates addressing the following items: <br />+ topography - to.po information is shown on the updated plan received6124119 <br />lighting details - a plan showing 3 wall. pack lights is shown on the Scheuneman <br />side of the building. One light is also planned on the east side <br />+ a parking.area.with landscaped island no island is proposed but the entryway <br />has been reduced in width by 30', creating space for Landscaping .on the. right- <br />of- way side of the property. The area was redesigned to show landscaping <br />rather than. a driveway; the landscaped area where the driveway was originally <br />groposed.could be considered an island. <br />• drainage plan showing best management practices <br />
The URL can be used to link to this page
Your browser does not support the video tag.