Laserfiche WebLink
THE ENCLAVE AT GEM LAKE DEVELOPMENT <br />STORMWATEIrR. MANAGEMENT <br />OPERATION & MAINTENANCE PLAN <br />INFILTRATION BASIN REQUIREMENTS <br />Fist Year After Planting: <br />Adequate water is crucial to plant survival. Provide temporary irrigation as needed unless rainfall is adequate, until <br />plants mature <br />As Neededa <br />* Prune and weed to maintain appearance. <br />* Stabilize or replace sail and vegetation when erosion is evident <br />• Remove trash and debris <br />■ Replace vegetation whenever percent cover of acceptable vegetation falls below 90 percent or project <br />specific performance requirements are not met, If vegetation suffers for no. apparent reason; consult with <br />horticulturist and/or test soil as needed <br />semi -Annually: <br />* Inspect inflow -and pretreatment systems for clogging (off-line systems) and remove any sediment <br />* Herbaceous.. vegetation, .trees and shrubs should be inspected to evaluate their health and replanted` as <br />appropriate <br />* Remove any dead or severely.diseased .vegetation <br />Annually in Fail: <br />* Inspect and remove any sediment and debris build-up in pretreatment areas <br />■ Inspect inflow points and infiltration surface. far. buildup of road. sand associated with spring melt period, <br />remove as necessary, and replant areas that.have been impacted by.sand/salt build up <br />Annually in Spring: <br />Cutback and remove. previous year's plant material and remove accumulated leaves if heeded <br />WET DETENTION BASIN SPECIIFiic REQUIREMENTS <br />■ Inspect annually during winter freeze periods to look for signs of improper operation. <br />■ Remove sediment in the permanent pool occur. every2 to 7 years :or after 50 percent of total permanent <br />pool capacity has been lost, In areas where road sand is. used, an inspection of the permanent pool should <br />be scheduled. after the spring melt to determine if clean -out is necessary. <br />• Mow the pond buffer periodically afong maintenance right-of-ways and the embankment.. Manage .the.. <br />remaining buffer as a meadow (mowing every other yeas),. prairie, or forest. <br />• Periodically, the outleticontrol structure may clog with debris. Debris should be refrioved and disposed of <br />outside of the facility limits. <br />Reference: MPG4 Stormwater Manual <br />