My WebLink
|
Help
|
About
|
Sign Out
Home
2022 03-15 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 03-15 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 7:53:50 AM
Creation date
1/8/2026 7:49:53 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
Show annotations
View images
View plain text
Gretchen Artig-Swoiiley <br />March 7, 2022 <br />Page 2 <br />Additionally, SEH.wilI assist the City in preparing a formal. notice of the.public meeting in sufficient.time.to <br />meet the necessary legal posting requirements for the notice. We will also prepare. public meeting <br />presentation.meeting materials including a Power. Point presentation summarizing -the City's 2021/2022. <br />MS4.activities and annual report information.. SEH will assist the City in analyzing the oral and written public <br />comments and, based. on the comments, make recommendations on adjustments to the Stormwater <br />Pollution Prevention Plan (SWPPP), if necessary, We assume that the public meeting will occur in person in <br />approximately fail. time. <br />Task 1.2.N1S4 Annual Report Assistance <br />SEH. Staff will. use their knowledge of the. City's program to. develop a word document version of the City's. <br />Annual Report for City review and input for the:previous. calendar year. Following receipt of City input, <br />:SEH will prepare a final draft within the online.reportformat for submission by City Staff. .The Annual <br />Report must be submitied:by June 30th, of each year (covers previous calendar year). <br />Task.1.3 MS4 Inspections <br />The City is required to complete the following iinspections.as part of their MS4.Program: <br />• Structural. Stormwater.E3MPs —Annually <br />s Ponds 100% during the.permit term <br />• Outfalls--1.00% during the permit term <br />• Stockpiles — Quarterly (NA — City does not own stockpiles) <br />SEH staff will complete all necessary MS4 inspections... An additional four (4) hours is.budgeted for a staff <br />engineer to respond to any illicit discharge identification or complaints following: MS4 inspections, <br />Following the completion of MS4 inspections, SEH Staff ensure that that. all proper MS4 Documentation <br />as required by the. MS4 perrnit has been completed and properly filed for future reference if/when .the <br />City's M$4 program is audited by the MPCA. <br />Task 2 MS4 Pro ram Updates <br />Task 2.1 Meetings <br />The application preparation. process will include up to six. (0) virtual meetings, including:. <br />• A kickoff meeting with the. MS4 team to discuss the required program. updates and overall goals <br />for the. future M5.4 program <br />• Up to two (2) update and check-1n meetings with ,City Staff, to discuss updates and progress <br />throughout project milestones. <br />• Up. to: two (2).update and check -in meetings with the City. Engineer,.to discuss updates and <br />progress throughout project milestones. <br />• A follow up meeting to discuss completed updates to the policy documents and.regulatory <br />mechanisms. <br />Task 2.2. Regulatory Mechanism Review and Updates <br />As part of the City's MS4. program, there are regulatory mechanisms in which the city must uphold. The <br />2020 MS4 permit requires updates to be made. to the City Code for sections pertaining to illicit discharge, <br />including pet waste. -and salt use and:storaget and stormwater management. SEH will collaborate with <br />Planning Commission and City Council and then review and. redline, relevant sections of. City Code and/or <br />.policy to meet the requirements of the new MS4 permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.