My WebLink
|
Help
|
About
|
Sign Out
Home
2016 04-05 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2016
>
2016 04-05 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:34:51 PM
Creation date
1/13/2026 9:39:45 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
Show annotations
View images
View plain text
approval. if the Plat is not recorded in this manner, it shall be considered void. <br />2.j Final Master Plan - The Master Plan for this project shall be provided with any updates and <br />changes identified in the Preliminary Plan review process and resubmitted as a new, clean. <br />submittals. All. items identified.in Step Two of this Ordinance shall also be updated and resubmitted <br />to :the Zoning. Administrator.. The applicant shall provided ten (1:0) copies of the Master Plan. <br />The.:Zoning Administrator shall review all of the material received and confirm the application's <br />completeness... The Zoning Administrator may request additional information. Upon determining <br />the Master Plan is complete, the Zoning Administrator shall distribute sets to those responsible for <br />project oversight. <br />When all materials have been approved, the Zoning Administrator shall sign. and issue the Zoning <br />Compliance Permit to begin the project.. <br />The applicant shall then provide and :execute a Development Agreement with the. City prior to <br />being issued City Building Permits. under this plan. <br />Step Four <br />As -built Data <br />1.) As -built Master Plan - Upon completion of the proposed project, the applicant shall submit three <br />ir. <br />(3) copies. of as -built drawings identifying all changes made through the construction process. <br />2.) As -built utility plans - Upon completion of the proposed project, the applicant shall submit three <br />.(3) copies of as -built drawings of..all water, sewer, coni.munications, and electrical utilities modified <br />or constructed during the project:.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.