My WebLink
|
Help
|
About
|
Sign Out
Home
2005 02-28 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2005
>
2005 02-28 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:23:21 AM
Creation date
7/20/2026 8:21:13 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
Show annotations
View images
View plain text
CITY OF GEM LAKE <br />NPDES - MS4 SWPPP <br />BMP DESCRIPTION SHEET <br />A. Unique Identification Number: 5-03-R <br />B. Name or Type of BMP: Private BMP Maintenance Plan Program <br />C. BMP Description: The City will continue a program that requires maintaining private Best Management Practices within the MS4. The City's <br />maintenance requirements are addressed in BMP 6-04-R. <br />D. Minimum Control Measure Addressed: Post -Construction Storm Water Management <br />E. Describe the measurable that will be used to determine success or benefits of this BMP: <br />1. Identification of privately owned BMP's in the City that have and do not have maintenance agreements by March, 2007. <br />2. Track the number of contacts to site owners to initiate repair or maintenance of the BMP as necessary (annually). <br />F. Describe the timeline or implementation schedule for this BMP: <br />1. Continue ongoing tracking and recording of condition of each BMP inspected. <br />2. EDUCATION PROGRAM / PUBLIC OUTREACH COMPONENT <br />a. Audience(s): Any resident or business that have an interest in storm water management practices. <br />b. Increased Awareness: Publish articles in newsletter and City website that address BMP maintenance and suggestions to residents <br />and businesses on BMP's that would minimize the need for maintenance in the future. <br />G. Person or department in charge of implementing this BMP: <br />I. Frederic C. Magnuson, City Clerk Telephone: 651-426-6443 <br />H. Summary of measurable goal attainment: <br />1. 2003 <br />a. See Public Education & Outreach Program to be implemented. Distributed ISTS Management bulletin to all ISTS operators in 2002. <br />2. 2004 <br />a. All privately owned BMP's have been identified. No solutions except related to ISTS have been noted. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.