My WebLink
|
Help
|
About
|
Sign Out
Home
2006 04-10 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2006
>
2006 04-10 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 8:35:05 AM
Creation date
7/20/2026 8:29:27 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CC PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
Show annotations
View images
View plain text
CITY OF GEM LAKE <br />MINUTES OF PUBLIC HEARING NO. C2006-02 <br />10 April 2006 <br />Gem Lake Public Hearing No. C2006-02 was convened at 7:08 PM on Wednesday, 12 April 2006 in the first floor <br />meeting room ofTousley Ford. Mayor Emeott, Councilors Watson, Bosak, and Rasmussen, Clerk Magnuson and Project <br />Engineer Mitchell were present. Also present were the followin- residents: <br />Richard Pientka <br />Roberta Pientka <br />Lenore Bolfing <br />Rich Nordstrom <br />3970 Tessier Road <br />3970 Tessier Road <br />3930 Haven Lane <br />3955 Tessier Road <br />Carolyn Nordstrom <br />Val Cremin <br />Pete Cremin <br />Al Schriber <br />3955 Tessier Road <br />3920 Haven Lane <br />3920 Haven Lane <br />3960 Haven Lane <br />Gordon Kordosky <br />Roys Andrews <br />Jerry Larsen <br />Deb Larsen <br />3911 Haven Lane <br />3950 Haven Lane <br />3945 Tessier Road <br />3945 Tessier Road <br />Motion by Bosak, Second by Watson to approve the agenda for the public hearing was unanimously approved. <br />Clerk Magnuson reported that the public hearing was properly noticed with Public Notice No. 2006-10a published <br />in the White Bear Press on 29 March 2006 and Public Notice No. 2006-10d mailed on 28 March 2006 to all fee title <br />owners of real property on Tessier Road and Haven Lane based upon records of Ramsey County Property Records and <br />Revenue. <br />Mayor Emeott made opening remarks, stating that the process of securing a feasability study for the reconstruction <br />of city streets began 2003, was ordered in April, 2005, upgraded in July 2005 to include city water and sewer, and <br />reviewed in March, 2006. The final feasability study for the work is to be presented here this evening. Emeott noted the <br />inclusion of city water and sewer in he feasability study was consistent with best management practices and the time line <br />established in the Gem Lake Comprehensive Municipal Plan of 1997. Emeott indicated that the City is also having a <br />feasability study completed for development of a City Water Plan which at some time in the near future could put city <br />water in proximity to the Big Fox/Little Fox neighborhood. The primary purpose of this hearing is to receive the Project <br />Engineer's Feasability Study and receive public comment from those affected by the proposed improvements. <br />Engineer Mitchell then presented the Feasability Study and the Summary, copies of which are attached hereto. As <br />the Feasability Study was already accepted at Public Hearing No. 2006-01, acceptance was waived. <br />Clerk Magnuson then identified several scenarios for needing to suddenly install city water including, but not limited <br />to, chemicals spills from adjacent industry or transportation, groundwater contamination, influence or mandate by other <br />govermnent agencies (MPCA, DNR, Public Health, Met Council, etc). Emeott cited North Oaks problems from former <br />dump. Magnuson cited recent fire at paint factory just north of the neighborhood and spills at wood treatment plant. <br />Magnuson asked if anyone present has had their well tested recently to which no response was received. Discussion <br />followed regarding mandatory well testing and the Clerk made note to consider the project asking the neighbors to draft <br />a petition requesting same. <br />Clerk Magnuson then read into the record written comments received from Dan and Sally Hendrickson of 3930 <br />Tessier Road, a copy of which is attached hereto. <br />Mayor Emeott then opened the floor for public comment as follows: <br />DEB LARSEN <br />If no one is pressing to install sewer, and water, why install the pipes? Emeott -best management practices encourage <br />looking at the possibility and we would be remiss in our duties as a Council not to do so, especially when we are <br />unaware of your feelings toward sewer and water. Inappropriate to dig up recently paved road to install sewer and/or <br />water if mandated. <br />What are costs and what is included. Mitchell responded per summary sheet. Magnuson also indicated perhaps some <br />of the maintenance money budgeted this year could be used for a portion of the curb reconstruction. The snow plowing <br />contractor may also have a stake in the matter due to snow plow damage. <br />JERRY LARSEN <br />Is there a time line under which sewer and/or water might be mandated by others? Magnuson - None that we are <br />aware of now but that is subject to the decisions of others. Unplanned installations are substantially more expensive. <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.