Laserfiche WebLink
NOW THEREFORE BE IT RESOLVED LVEll by the City Council (the "Council") of the City <br /> Roseville, Minnesota (the"City"), Ramsey County, Minnesota, that an interim use permit <br /> �#Rosev <br /> the concrete crushing and mixing operations on a portion of a 20-acre County- <br /> owned allow � <br /> owned parce <br /> I located east of Dent Street and north of Larpenteur Avenue be approved <br /> subject to the following conditions: <br /> 1 Only y materials from the La enteu r Avenue reconstruction project may be crushed <br /> . <br /> and batch mined at this location. No ether construction projects shall be allowed to <br /> Upiggy-back" on this activity. <br /> 2. Stockpiles of concrete to be crushed and/or crushed concrete shall not exceed 20 <br /> fe et in height and shall remain on the site, in the location and with the setbacks <br /> illustrated in the approved site plan, for a period net to exceed one year. The site <br /> shalt be gated and locked when not in operation. <br /> 3. Concrete crushing activities shall be limited to a maximum of 15 days between April <br /> 1a y <br /> and May 15 in 1998, a maximum of 15 days between January I and May 15 in <br /> and a maximum of 10 days during the construction season in 2000. Hours <br /> of crushing shin activities shall be limited to 8:00 a.m. to 5:00 p.m., Monday through <br /> Friday. <br /> 4. Concrete batch mixing activities shall be limited to a maximum of two separate <br /> occasions per er construction season in 1 998, 1999, and 2000, for up to five working <br /> days per occasion. Hours of concrete batch mixing and hauling activities shall be limited to 7:00 a.m. to 10:00 p.m., Monday through Friday. <br /> ed residents shall receive written notice from the County at least five days <br /> �. Effected <br /> prior to the core mencement of concrete crushing or concrete batching activities. <br /> The original list of residents to be notified will be provided by the Community <br /> Development Director, with the understanding than other residents will be placed on <br /> the notification list by requesting such action of the County. <br /> 6. The cou n ty shall provide the City with a letter from the Minnesota Pollution Control <br /> Agen c y �statin that the noise levels of the crushing and batch mixing machinery, <br /> carrying belts loading equipment, and hauling equipment(when all are in operation) <br /> do not <br /> exceed MPCA noise standards or are exempt from such standards. If such <br /> a left <br /> e r cannot be obtained, or as an alternative to meet noise standards in <br /> residential neighborhoods, the county may propose sound baffle good walls <br /> surroundin g equipment the a ui ment as approved by the City's sound consultant. <br /> County shall submit a site plan with accurate dimensions, landscape plan, berm <br /> �� The ty <br /> grading R <br /> and seeding Ian, circulation plan, and erosion control plan to the <br /> Community R <br /> ni Development Director for review and approval prior to issuance of the <br /> R <br /> Interim Use Permit. The landscape plan shall include the installation of a vegetative <br /> en aloe north berm area of the site. The vegetative screen shall include no <br /> sore � <br /> fewer than 40 evergreen trees, not less than 6 feet in height planted eight feet on <br /> center. All plantings,lantin s f g �radin , seeding, and erosion control improvements shall be <br /> completed by .duly i, 1998. <br /> Resolution�- Page 2 of 4 <br />