Laserfiche WebLink
The Plan seeks to upgrade the commercial center and other uses to enhance and <br /> serve the needs of local residents. <br /> The Plan seeks to provide sufficient public and private open space areas <br /> throughout the neighborhood that are essential elements of community life and <br /> "sense of place" and to provide public connections through streets and <br /> pedestrian trails within the neighborhood. <br /> 3.2 The approved master plan for the Hamline Shopping Center site specifically (referred <br /> to as Phase II) includes a density of 80-140 housing units and a total of 35,000 — <br /> 95,000 square feet of retail/office space. These densities vary based upon if the outlot <br /> is developed as housing or office space. (An exerpt from the Master Plan for that area <br /> is attached) <br /> 3.3 Staffs understanding of Presbyterian Home's proposal includes one 5-story building <br /> located at the Southeast comer of the site that would include 13,000 square feet of <br /> neighborhood retail on the first floor and approximately 100 units of market rate <br /> independent senior apartments. The office building at the northeast side of the site <br /> would remain as this is Presbyterian Homes' office headquarters. <br /> 3.4 The proposal includes greenspace to the back of the lot with a stormwater pond <br /> created as an amenity to the site with walking trails. In addition, the proposal <br /> includes an outlot for future development as either additional housing or a small <br /> office. <br /> 4.0 PUBLIC REDEVELOPMENT ASSISTANCE: <br /> 4.1 Pres. Homes have indicated a need for tax increment financing or tax abatement <br /> assistance for the project. The Arona-Hamline Master Plan indicated that the <br /> Phase Two redevelopment (Hamline Shopping Center site) may require city or <br /> other financial assistance to reduce the costs of removal of asbestos and building <br /> materials. <br /> 4.2 Hamline Shopping Center site in not currently in a tax increment district. Further <br /> review regarding the pros and cons will be required by staff and the developer to <br /> determine the feasibility of creating a new district and/or the possible use of tax <br /> abatement. <br /> 4.3 Similar to Twin Lakes, the fiscal challenges of land assembly, business relocation, <br /> and razing of blighted buildings, along with environmental, infrastructure, <br /> neighborhood and market forces requires creativity, commitment and perseverance <br /> (time!) from all public funding partners but most importantly from the local <br /> community. The local benefits from redevelopment such as increased tax dollars, <br /> improved quality of life, improved environmental resources and quality jobs and new <br /> housing opportunities must continue to be part of the shared vision of the policy <br /> makers and community as any redevelopment process moves forward — big or small. <br /> PF3445 —RCD--Pres Homes Proposal (I 11802) Page 2 of 3 <br />