Laserfiche WebLink
Road C2 and Highway 88, creates a practical difficulty for the applicant and <br /> pre justification Bents for granting variances to the wetland setback <br /> requirements. In order to mitigate the impacts of encroaching into the <br /> setback area stormwater run-off will need to be pre-treated prior to being <br /> s � � , <br /> discharged into the wetland and native vegetation will be required in the <br /> yeas being filled. The applicant is working with the Rice Creek Watershed <br /> District on these issues and specific requirements will be incorporated into <br /> the final PUD agreement. <br /> 44 The overall density of the project (30 units on 2.97 acres) will net exceed <br /> medium density residential standards (4-10 units per acre); however, the <br /> units will be clustered in one three-story 30 unit building rather than in <br /> town homes. In addition, the clustering of the units in one building presents <br /> the advantage of needing only one access point on County Road C2 and no <br /> access points on Trunk Highway 88. <br /> 5. The adjacent parcel to be used for the second phase of the project is <br /> currently an unused hard-surfaced parking area. It appears that this parking <br /> area contributed significantly to the creation of the wetland on the triangular- <br /> shaped <br /> parcel. In addition, the reduction of impervious surface on this parcel <br /> P <br /> ma Y an have impact on the wetland mitigation being developed for approve <br /> by the Rice Creek Watershed District. <br /> 6. The floor elevation of the proposed underground parking garage will be <br /> below the water level of the existing wetland- therefore, soil borings of this <br /> area are needed. The applicant has obtained a soil borings report for the <br /> property, which will be reviewed by the City prior to any building permits <br /> p Y, <br /> being issued for the project. If necessary, requirements related to this issue <br /> will be incorporated into the final PUD agreement. <br /> utility servicing plan must be submitted to and approved by the City prior <br /> to consideration of the final development plan. <br /> 8. used on the proposed osed use of the building for seniors and empty-nesters! <br /> he 0 off-street parking spaces for visitor parking may not be needed. For <br /> t � � <br /> this reason consideration should be given to reducing the amount of off- <br /> street parking being provided for the first phase, with proof-of-parking <br /> p � � p <br /> documentation of additional parking is needed in the future. <br /> 9. The project will have minimal traffic impacts on the surrounding roadways. <br /> County <br /> Road C2 has a forecasted average daily traffic count (ADT) of 1600 <br /> in 2MO (west of H i hwa 8 and Highway 88 has a forecasted ADT of <br /> 13,700. Phase 1 of project as proposed is expected to generate a maximum <br /> bo vehicle trips per day.. The new signal at county road c and <br /> of���to I� p y <br /> Highway <br /> 8 will benefit residents by providing safe ingress and egress to the <br /> property. <br /> FICA(P F#2891) -01/12/98 - Page 4 of 6 <br />