Laserfiche WebLink
of two new off ice/warehouse facilities being constructed in two <br /> phases. The first phase of developrment would consist of a new <br /> building of approximately 99,480 s q# ft. and the rehabilitation <br /> and upgrading of the 60, 000 sq# ft, warehouse facility that was <br /> constructed in 1985. The second phase of development proposes <br /> the construction of a new building of approximately 53, 265 sq, <br /> f t. The existing truck terminal facility has seven underground <br /> storage tanks located at the north end of the site and around <br /> the service garage. The proposed development would include the <br /> removal of these underground storage tanks, the reined i at i on of <br /> any contaminated soils associated with the tanks, and the <br /> removal of any asbestos or other hazardous material that may be <br /> associated with the existing terminal, The eastern portion of <br /> the site has environmental concerns of a more significant <br /> naturee The applicant has indicated that testing done to date <br /> has indicated levels of soil and ground water contamination of <br /> some significance. The proposed development would also include <br /> the reined iation of the existing soil contamination on the east <br /> portion of the property. <br /> 3 * Because of the current tax parcel configuration of the <br /> property,, a subdivision i-s being requested in order to allow <br /> for the closing on the first phase of the project with the <br /> current land owner, to be followed immediately thereafter !by <br /> the demolition of the existing truck terminal and serv3.ce <br /> garage,, the removal of the underground storage tanks, and the" <br /> commencement of construction of the 96, 625 sq. ft, first phase <br /> office warehouse facility. The first phase, which also <br /> includes the updating of the existing warehouse face l ity, would <br /> be completed ire 1994 , Construct i on of the second phase is <br /> scheduled to commence in 1995 f of lowing time for the <br /> environmental remediation of the east portion of the site• The <br /> proposed subdivision would create a new plat consisting of <br /> three lots. Lot 1 would contain the existing 1985 warehouse, <br /> lot 2 would contain the 96, 625 sq. ft. off ice/warehouse <br /> facility, and lot 3 would contain the second phase facility <br /> • t, office warehouse* The <br /> consisting of a 53 ,2 5 sq* f <br /> development will include approximately $5. 5 million of new <br /> construction, <br /> 4 , The remodeling of the existing 600000 sq, ft. warehouse <br /> building and the addition of two new structures will create a <br /> "front door office park" image along county Road c in this <br /> area. Landscaping along County Road c consists of boulevard <br /> trees spaced consistently with the design standards requirement <br /> of the Roseville City Code, a 4 0 foot wide green space area, a <br /> landscape parking screen and. planting beds adjacent to the <br /> buildings. Tres and planting beds are also provided in <br /> • , he applicant has indicated <br /> islands interior to parking areas. �' <br /> that all landscaping will have automatic irrigation systems. <br /> The operational aspects of the building and truck loading areas <br /> will be screened from public view by the configurations of the <br /> buildings. <br />