My WebLink
|
Help
|
About
|
Sign Out
Home
1993_1025_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_1025_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2011 9:31:01 AM
Creation date
10/13/2011 9:23:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE ANALYSIS <br /> Total Site Area 84 ,092 sq. ft* <br /> Proposed Building 15, 000 sq, ft. (17s8%) <br /> Proposed Parking 37,340 sq* ft* (44.4%) <br /> Green space 24,792 bq. ft. (2965%) <br /> Existing center Driveway 4, 860 sg+ ft. ) <br /> Existing city Sidewalk 660 sq. ft. (098%) <br /> Future city Sidewalk 1,4 4 0 sq* ft* (1,7%) <br /> Parking Required: 5 spaces per 1,000 sq. ft. building floor <br /> area = 75 stalls. <br /> Handicap Accessible Parking Required: 1 accessible stall per <br /> 25 stalls = 3 stalls . <br /> PARKING PROIDEDIR <br /> Full Size (9X18) 71 stalls <br /> Handicap Accessible 3 stalls <br /> Handicap Van Accessible 1 stall <br /> - Total Parking Provided 75 stalls <br /> The Computer City project meets or exceeds the following design <br /> � y p ro7 <br /> standards and other code provisions: <br /> 1. The building materials are now proposed to be face brick <br /> and break off masonry units* <br /> 2d, The landscaping, both inside the parking and along the <br /> site edges meets or exceeds the code standards for the <br /> amount of landscaped area and the spacing of plants* <br /> It <br /> 3-a Loading area at the northeast end of the building is <br /> screened with a solid wall as required. Technically, no <br /> screenin g is required between commercial uses (toward the <br /> Crossroads Center) but a screen wall and landscaping is <br /> provided on the north side anyway. <br /> 4 <br /> 4* Trash handling is within a completely enclosed structure <br /> attached to the east end of the building. <br /> 5. Parkin spaces, provided at a ratio of 5 stalls ,per <br /> Parking 000 s ft. of building, <br /> 1.o00 sq; ft o , 75 spaces for 15,000 sq <br /> . ,ft. <br /> the City standards. <br /> 68 The building meets the 35 foot height limit. <br /> The only rov i s i ons that require 'variances are. the setbacks, <br /> The sC district requires loo foot setbacks on all s ides, except <br /> for 60 feet s ideyard and rear yard setbacks to H-2 and B-3 <br /> zonin g districts,& It does not mention a setback to other SC <br /> districts but we could reasonably interpret the code to mean <br /> that Sit and H-3 are similar enough to SC to allow a 60 foot <br />
The URL can be used to link to this page
Your browser does not support the video tag.