My WebLink
|
Help
|
About
|
Sign Out
Home
1993_0405_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
1993
>
1993_0405_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2011 8:43:23 AM
Creation date
10/18/2011 1:10:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />M -92 -23 <br />4/8/93 <br />site grading, design fees and the ice system ., The f figure for the ice <br />system uses the Shingobee base bid but also assumes that through later <br />change orders, $43,000 could be subtracted from the base bid, and the <br />net project bid would then be $2,015,000. These options have recently <br />been reviewed with the council. <br />It should be clearly understood that based on the bid documents, the <br />financial analysis of the bids can only include base bid and the four <br />listed alternates. optional alternates cannot be used as a basis for <br />award of bid. <br />Based on the budget analysis, assuming no major contingencies and cost <br />overruns for the ice system, there should remain approximately $330,000 <br />for other project components including buildings and site improvements. <br />To build the site improvements and building as desired, additional <br />financing will have to be obtained* This has been discussed in detail at <br />previous meetings with the council and several options have been <br />outlined. <br />Staff recommendation e. Based on the low ]yid of Shingobee Builders and <br />the extensive analysis provided by Bonestroo, Rosene, Anderlik, staff <br />believes that Shingobee is the most qualified firm to complete this <br />project and has submitted the lowest responsible base bid. Accordingly, <br />we recommend that the council accept the bid and award the contract for <br />City Project M-92-23 to Shingobee Brothers in the base bid amount of <br />$2,058,000 with no alternates' being considered* <br />RECOMMENDED COUNCIL ACTION* <br />Adoption of resolution awarding bids for City Project M-92-23, John Dose <br />Minnesota oval bandy /speed skating facility ice system, to Shingobee <br />Builders in the base bid amount of $2,058,000 with no bid alternates <br />being considered and authorization to sign construction contracts with <br />Shingobee Builders, <br />
The URL can be used to link to this page
Your browser does not support the video tag.