April 1, 1993
<br />City of l oseviDe
<br />2660 M' 'c Center Drive
<br />osevihe, NIN 55113
<br />e; John Rose N innesota Oval
<br />Refrigeration System Bids
<br />Our File No. 42502
<br />Dear Honorable Mayor and Council:
<br />Mark D. VWjlis, P.E.
<br />Miles S. .Jensen. RE.
<br />L. Phillip Gravel ill, P.E.
<br />Karen L. Wiemeri. P.E.
<br />Gary D Kris . P.E.
<br />F. Todd Foster. PE.
<br />Keith R. Yap PE.
<br />Douglas J. Benoit. P.E.
<br />Shawn} D. Gustafson, P.E.
<br />Cecillo Oivier. P.E.
<br />Charles A. Erickson
<br />'Leo M. Pawielsky
<br />Harlan M. Olson
<br />Jarnes P Engelhardt
<br />We are pleased to report to you that we have 'completed the review of the Design /Build
<br />Proposals received for the John Rose Minnesota Oval Refrigeration System. Based on our
<br />thorough review of all bid proposals received, we recommend that the Council awards the
<br />project to the Shffigobee Builders, Inc. team based on their low responsive Base Bid of
<br />$290589000-00.
<br />A total of eight (g) bid proposals were received with two ) of the bids being non - responsive
<br />to th a design criteria. Attached is' a summary of the eight 8) bids received, As you will note,
<br />the "responsive" bids on this summary ranged from a low base bid of ,058,000.00 to a high
<br />of $2,554,000.00. Alternate bids were also received for: 1 Additional 1 inch of subslab
<br />insulation; 2) Additional 90 tons of refrigeration; 3) 2 Year project warranty; and 4) 5 Year
<br />project warranty. In addition, a number of optional bids were proposed by some of the groups
<br />for future consideration. The selection rules allow for the award to be made on the base bid
<br />and /or any combination of Alternates 1 ;4. Optional bids cannot be considered in the award.
<br />In addition, the proposal must also meet the mininu�n criteria outlined in the Invitation for
<br />Proposals,.
<br />Our recommended award to Shigobec Builders, Inc. is based of a thorough evaluation of all
<br />p ro p p osals and considers all evaluation criteria established in the Invitation for proposals
<br />including:
<br />* project cost
<br />* System design and details
<br />* Conformance of system components to specified products
<br />* Team qualifications and experience
<br />* proposed construction schedule
<br />* Financial resources
<br />Page 1.
<br />450.cor
<br />2335 blest Highway 36 * St. Paul, MN SS113 * 612-636-4600
<br />OMO G. Son a P.E.
<br />Howard A. Sanford, RE.
<br />Michael P Rau, PE.
<br />Sonestroo
<br />r W Ros". P.E.:
<br />Ke th A. Gordon, P.E.
<br />Philip l. Pyre. RE.
<br />JA
<br />Joseph C. An &rlik, PE.
<br />Robert R. Pltfferle, P.E.
<br />Agnes M. RinZ A.I.CA
<br />Rosene
<br />Marvin L. Sorvala, RE,
<br />Richard E. Tumer, P.E.
<br />Richard W Fbsrer, P.E.
<br />David 0 Loskota, P.E.
<br />Thomas W. Pr"rson, P.E.
<br />Michael C. Lynch, P.E.
<br />jMderllk &
<br />Gienn R.
<br />Thomas E. mss, PE.
<br />Robert C. Russek,
<br />Bourdon, P.E.
<br />Jerry D. Pcr=h,r `
<br />RE .
<br />Assoclates
<br />Robert G. SchunkhL PE.
<br />Susan M. Eberiin. CPA
<br />lurk A. Hanson, RE.
<br />Michael T. Rautmann, P.E.
<br />Kenneth P. Anderson, P.E_
<br />Mark R. Roft P.E.
<br />*Senior Consultant
<br />Ted K. Field, PE.
<br />Mark A. Sekc, PE.
<br />Engineers & Architects
<br />Thomas B. Armlerson. AI A.
<br />Donald C. Rurgardt P.E.
<br />Gary W Morien, RE.
<br />Daniel I Edgerton. P.E.
<br />Thanus E. Angus, P.E.
<br />Allan Rick SohhmW P.E.
<br />Ism Martinez, P.E.
<br />Philip .J. Caswell, PE.
<br />April 1, 1993
<br />City of l oseviDe
<br />2660 M' 'c Center Drive
<br />osevihe, NIN 55113
<br />e; John Rose N innesota Oval
<br />Refrigeration System Bids
<br />Our File No. 42502
<br />Dear Honorable Mayor and Council:
<br />Mark D. VWjlis, P.E.
<br />Miles S. .Jensen. RE.
<br />L. Phillip Gravel ill, P.E.
<br />Karen L. Wiemeri. P.E.
<br />Gary D Kris . P.E.
<br />F. Todd Foster. PE.
<br />Keith R. Yap PE.
<br />Douglas J. Benoit. P.E.
<br />Shawn} D. Gustafson, P.E.
<br />Cecillo Oivier. P.E.
<br />Charles A. Erickson
<br />'Leo M. Pawielsky
<br />Harlan M. Olson
<br />Jarnes P Engelhardt
<br />We are pleased to report to you that we have 'completed the review of the Design /Build
<br />Proposals received for the John Rose Minnesota Oval Refrigeration System. Based on our
<br />thorough review of all bid proposals received, we recommend that the Council awards the
<br />project to the Shffigobee Builders, Inc. team based on their low responsive Base Bid of
<br />$290589000-00.
<br />A total of eight (g) bid proposals were received with two ) of the bids being non - responsive
<br />to th a design criteria. Attached is' a summary of the eight 8) bids received, As you will note,
<br />the "responsive" bids on this summary ranged from a low base bid of ,058,000.00 to a high
<br />of $2,554,000.00. Alternate bids were also received for: 1 Additional 1 inch of subslab
<br />insulation; 2) Additional 90 tons of refrigeration; 3) 2 Year project warranty; and 4) 5 Year
<br />project warranty. In addition, a number of optional bids were proposed by some of the groups
<br />for future consideration. The selection rules allow for the award to be made on the base bid
<br />and /or any combination of Alternates 1 ;4. Optional bids cannot be considered in the award.
<br />In addition, the proposal must also meet the mininu�n criteria outlined in the Invitation for
<br />Proposals,.
<br />Our recommended award to Shigobec Builders, Inc. is based of a thorough evaluation of all
<br />p ro p p osals and considers all evaluation criteria established in the Invitation for proposals
<br />including:
<br />* project cost
<br />* System design and details
<br />* Conformance of system components to specified products
<br />* Team qualifications and experience
<br />* proposed construction schedule
<br />* Financial resources
<br />Page 1.
<br />450.cor
<br />2335 blest Highway 36 * St. Paul, MN SS113 * 612-636-4600
<br />
|