Laserfiche WebLink
April 1, 1993 <br />City of l oseviDe <br />2660 M' 'c Center Drive <br />osevihe, NIN 55113 <br />e; John Rose N innesota Oval <br />Refrigeration System Bids <br />Our File No. 42502 <br />Dear Honorable Mayor and Council: <br />Mark D. VWjlis, P.E. <br />Miles S. .Jensen. RE. <br />L. Phillip Gravel ill, P.E. <br />Karen L. Wiemeri. P.E. <br />Gary D Kris . P.E. <br />F. Todd Foster. PE. <br />Keith R. Yap PE. <br />Douglas J. Benoit. P.E. <br />Shawn} D. Gustafson, P.E. <br />Cecillo Oivier. P.E. <br />Charles A. Erickson <br />'Leo M. Pawielsky <br />Harlan M. Olson <br />Jarnes P Engelhardt <br />We are pleased to report to you that we have 'completed the review of the Design /Build <br />Proposals received for the John Rose Minnesota Oval Refrigeration System. Based on our <br />thorough review of all bid proposals received, we recommend that the Council awards the <br />project to the Shffigobee Builders, Inc. team based on their low responsive Base Bid of <br />$290589000-00. <br />A total of eight (g) bid proposals were received with two ) of the bids being non - responsive <br />to th a design criteria. Attached is' a summary of the eight 8) bids received, As you will note, <br />the "responsive" bids on this summary ranged from a low base bid of ,058,000.00 to a high <br />of $2,554,000.00. Alternate bids were also received for: 1 Additional 1 inch of subslab <br />insulation; 2) Additional 90 tons of refrigeration; 3) 2 Year project warranty; and 4) 5 Year <br />project warranty. In addition, a number of optional bids were proposed by some of the groups <br />for future consideration. The selection rules allow for the award to be made on the base bid <br />and /or any combination of Alternates 1 ;4. Optional bids cannot be considered in the award. <br />In addition, the proposal must also meet the mininu�n criteria outlined in the Invitation for <br />Proposals,. <br />Our recommended award to Shigobec Builders, Inc. is based of a thorough evaluation of all <br />p ro p p osals and considers all evaluation criteria established in the Invitation for proposals <br />including: <br />* project cost <br />* System design and details <br />* Conformance of system components to specified products <br />* Team qualifications and experience <br />* proposed construction schedule <br />* Financial resources <br />Page 1. <br />450.cor <br />2335 blest Highway 36 * St. Paul, MN SS113 * 612-636-4600 <br />OMO G. Son a P.E. <br />Howard A. Sanford, RE. <br />Michael P Rau, PE. <br />Sonestroo <br />r W Ros". P.E.: <br />Ke th A. Gordon, P.E. <br />Philip l. Pyre. RE. <br />JA <br />Joseph C. An &rlik, PE. <br />Robert R. Pltfferle, P.E. <br />Agnes M. RinZ A.I.CA <br />Rosene <br />Marvin L. Sorvala, RE, <br />Richard E. Tumer, P.E. <br />Richard W Fbsrer, P.E. <br />David 0 Loskota, P.E. <br />Thomas W. Pr"rson, P.E. <br />Michael C. Lynch, P.E. <br />jMderllk & <br />Gienn R. <br />Thomas E. mss, PE. <br />Robert C. Russek, <br />Bourdon, P.E. <br />Jerry D. Pcr=h,r ` <br />RE . <br />Assoclates <br />Robert G. SchunkhL PE. <br />Susan M. Eberiin. CPA <br />lurk A. Hanson, RE. <br />Michael T. Rautmann, P.E. <br />Kenneth P. Anderson, P.E_ <br />Mark R. Roft P.E. <br />*Senior Consultant <br />Ted K. Field, PE. <br />Mark A. Sekc, PE. <br />Engineers & Architects <br />Thomas B. Armlerson. AI A. <br />Donald C. Rurgardt P.E. <br />Gary W Morien, RE. <br />Daniel I Edgerton. P.E. <br />Thanus E. Angus, P.E. <br />Allan Rick SohhmW P.E. <br />Ism Martinez, P.E. <br />Philip .J. Caswell, PE. <br />April 1, 1993 <br />City of l oseviDe <br />2660 M' 'c Center Drive <br />osevihe, NIN 55113 <br />e; John Rose N innesota Oval <br />Refrigeration System Bids <br />Our File No. 42502 <br />Dear Honorable Mayor and Council: <br />Mark D. VWjlis, P.E. <br />Miles S. .Jensen. RE. <br />L. Phillip Gravel ill, P.E. <br />Karen L. Wiemeri. P.E. <br />Gary D Kris . P.E. <br />F. Todd Foster. PE. <br />Keith R. Yap PE. <br />Douglas J. Benoit. P.E. <br />Shawn} D. Gustafson, P.E. <br />Cecillo Oivier. P.E. <br />Charles A. Erickson <br />'Leo M. Pawielsky <br />Harlan M. Olson <br />Jarnes P Engelhardt <br />We are pleased to report to you that we have 'completed the review of the Design /Build <br />Proposals received for the John Rose Minnesota Oval Refrigeration System. Based on our <br />thorough review of all bid proposals received, we recommend that the Council awards the <br />project to the Shffigobee Builders, Inc. team based on their low responsive Base Bid of <br />$290589000-00. <br />A total of eight (g) bid proposals were received with two ) of the bids being non - responsive <br />to th a design criteria. Attached is' a summary of the eight 8) bids received, As you will note, <br />the "responsive" bids on this summary ranged from a low base bid of ,058,000.00 to a high <br />of $2,554,000.00. Alternate bids were also received for: 1 Additional 1 inch of subslab <br />insulation; 2) Additional 90 tons of refrigeration; 3) 2 Year project warranty; and 4) 5 Year <br />project warranty. In addition, a number of optional bids were proposed by some of the groups <br />for future consideration. The selection rules allow for the award to be made on the base bid <br />and /or any combination of Alternates 1 ;4. Optional bids cannot be considered in the award. <br />In addition, the proposal must also meet the mininu�n criteria outlined in the Invitation for <br />Proposals,. <br />Our recommended award to Shigobec Builders, Inc. is based of a thorough evaluation of all <br />p ro p p osals and considers all evaluation criteria established in the Invitation for proposals <br />including: <br />* project cost <br />* System design and details <br />* Conformance of system components to specified products <br />* Team qualifications and experience <br />* proposed construction schedule <br />* Financial resources <br />Page 1. <br />450.cor <br />2335 blest Highway 36 * St. Paul, MN SS113 * 612-636-4600 <br />