Laserfiche WebLink
7.0 STAFF RECOMMENDATION AND CONDITIONS: <br />8.1 Staff recommends approval of this project and the four actions necessary to begin preparation <br />of final documents, with conditions. It undoubtedly is a new building type in this area, and it <br />sets a new higher quality standard for redevelopment near public and semi public amenities. <br />City utility services already serve this site and have adequate capacity to support the new <br />structures. The developer has worked with the neighborhood on site issues. Since this project <br />does not meet the thresholds, no Environmental Assessment Worksheet is required. The <br />site planning and landscape architecture is well done, the architecture matches the theme set <br />by the new country club, and the earthwork engineering will improve ponding capacity. The <br />Comprehensive Plan encourages a diversity for housing styles for all age groups — with that <br />comes some changes in density. This is not unique — throughout Roseville housing densities <br />vary and adjoin each other (the city has had over 20 similar projects in the past 10 years). <br />Since this is a parcel that is isolated from the adjoining single - family homes and is located on <br />a county collector road — as is encouraged in the Comprehensive Plan, the project will have <br />little or no pedestrian or vehicular impact on the adjoining neighborhoods. In fact for the <br />neighbors to the east and west, the housing which parallels Fulham may reduce noise and light <br />from golf course patrons. The recommended conditions follow: <br />a. The architectural design of the two projects must be consistent with the Midland Hills <br />Club House, and be compatible with the general context and human scale of the <br />neighborhood for both architecture design and building materials. The condominium <br />proposal must incorporate hip roofs to lower overall height and other architectural <br />elements to further enhance each structure and reduce the visual mass of the building. <br />A similar exterior architectural treatment must be incorporated into the design of the <br />row town homes. <br />b. The Rice Creek Watershed District and the Public Works Department must complete <br />the review and approve of the grading, drainage, and utility plans proposed with the <br />General Concept and Final Plan submittal. All plans, including the location of fire <br />hydrants and utility services connections, require the approval of the Public Works <br />Department. <br />C. The surface parking lot for the condominium parcel proposes 13 off - street visitor <br />parking spaces is adequate, assuming that a cross parking easement with the Country <br />Club and/or a proof of parking agreement is provided. <br />d. All buildings, tree branches and roots, debris, and any soil contamination (subject to <br />MnPCA requirements) must be removed from the site (not burned on the site) prior to <br />the issuance of a building permit. <br />e. Park dedication is required. Staff recommends for this development cash payment in <br />lieu of land dedication. The payment amounts to $6,000 for the town home site and <br />$30,000 for the condominium site. The park fee is placed in the park dedication•and <br />redevelopment fund. The Park and Recreation Commission will review this before final <br />approvals. ' <br />PF3471 — RCA 102003 Page 8 of 10 <br />