My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0929_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0929_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2011 9:37:30 AM
Creation date
10/19/2011 4:20:20 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Roseville, f <br />Addendum to Agreement <br />Collectio-T, <br />Effective September , 2003 <br />This Addendum dated as of September _, 2003 is made by and between the Cit <br />of Roseville, a municipal corporation, ("' City") and Waste Management of <br />Minnesota, ( "Contractor' } ). <br />WHEREAS, the parties entered into that certain Agreement for Recycling <br />g <br />Collection dated January 1, 2003, expires, December 31, 005 • and <br />WHEREAS., the parties now wish to extend the term of the Contract P ursuant to <br />the terms and conditions specified herein, <br />NOW, THEREIN ORE, the parties agree that effective as of September 2003 <br />the term of the Recycling Agreement shall be extended for five ears through <br />� g <br />December 31, 2008, subject to the following terms and conditions: <br />Agreement <br />1. Transition: Effective upon delivery of the recycling carts the recycling <br />g <br />service shall be switched from the current two (2) sort system to 4`single sort' <br />(commingled in a single 32, 64, or 96 gallon cart). <br />2. Recycl niz ate: Each Residential Dwelling gait ("RDU") will be required <br />to receive a 64- gallon cart. After (90) days use, this cart may be upgraded to a <br />96 gallon or down graded to 3- gallon cart at the residents request. <br />3. Delivery: Initial cart delivery of 64-gallon carts to all 1J s shall be made <br />within ninety (90) days of the date of the agreement. The entire cost of the <br />cart, can delivery} cart repair and replacement shall be the responsibility of the <br />Contractor. <br />4. Promotion and Public Education: The Contractor and the City shall work <br />together in the preparation and distribution of educational materials to insure <br />accurate information and program directions. The Contractor shall submit a <br />draft of any public education literature for approval by the 0ty. <br />
The URL can be used to link to this page
Your browser does not support the video tag.