My WebLink
|
Help
|
About
|
Sign Out
Home
2003_0602_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2003
>
2003_0602_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2011 3:15:45 PM
Creation date
10/21/2011 2:42:11 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 29, 2003 <br />City of Roseville <br />Ir. Duane Schwarz <br />2660 Civic Center Drive <br />Roseville, Minnesota 55113 <br />Re: City of Roseville City Hall & Public Works Pro iect <br />Bid Group #2 Award Letter — Midwest Asphalt <br />Asphalt Paving <br />Dear Duane: <br />via fax 651- 490 -2275 <br />Five Generations <br />Building Confidence <br />Following analysis of the responses to our Request for Proposal ##1(RFP ## 1) for the Asphalt Paving <br />work for the project listed above, we recommend awarding the work to Midwest Asphalt Corporation <br />based on their initial low bid of 101, 100 for Bid Group ##2. All proposais were in accordance with <br />the Request for Proposal documents and its requirements. A brief timeline of the entire proposal and <br />review process follows: <br />• Proposals received from seven firms on May 21, 2003. <br />• Copies of each proposal received were provided to the City of Roseville on May 21, 2003. <br />• A proposal spreadsheet for scope review was generated by McGough and if necessary, brought to <br />equilibrium. This recommended contractor was the initial low bidder. <br />• Numerous phone conversations were held on various dates discussing the bid scope. <br />Again} we received a total of seven competitive responses. once we receive your formal approval we <br />will notify the selected subcontractor and immediately begin to draft a copy of a subcontract for your <br />review. <br />Sincerely, <br />McGough Construction <br />Dustin Schwabe <br />Project Manager <br />cc. File — 02741 <br />Jinn Frisell - Mc Gough Construction <br />Parr Anderson - AIWA <br />
The URL can be used to link to this page
Your browser does not support the video tag.