h'iAR -03. 2003 136 46 RATWIK ROSZAK MALONEY <br />—additional Work performed on the basis of actual costs of labor <br />and materials, and other Work requiring accounting records. <br />2.3. 11 The Construction Manager shall develop and <br />Mplement procedures for the review and processing of <br />applications by Contractors for progress and final payments. <br />2,3.11.1 Based on the Construction Manager's observations <br />and evaluations of each Contractor's Application for Payment, <br />the Construction M2Lnager shall review and certify the atnounts <br />due the respective Contractors. <br />2.3.11.2 The Consiruction Manager shall prepare a Project <br />Application for payment based on the Contractors" Certificates <br />for payrnent. <br />2.3.11.3 The Construction Managers certification for <br />payment shall constitute a representation to the Owner, based <br />on the Construction Manager's determinations at the site as <br />provided in Subparagraph :2.3. r3 and on the data comprising the <br />Contractors' Applications for Payment, that, to the best of the <br />Construction Manager's knowledge, information and belief, the <br />Work has progressed to the point indicated and the quality of <br />the Mork is in accordance with the Contract Documents. The <br />foregoing reprentations are subject to an evaluation of the <br />Work for conformance with the Contract Documents upon <br />Substantial Completion, to results of subsequent tests and <br />inspections, to mirror deviations from the Contract Documents <br />correctable prior to completion and to specific qualifications <br />expressed by the Construction Manager. The issuance of a <br />erti orate for Payment shall Further constitute a represen Lation <br />that the Contractor is entitled to payment In the amount <br />certified. <br />2.3.11.4 The issuance of a GerLificate for Payment shall not <br />be a representation that the Construction Manager has (t) <br />made exhaustive or continuous on -site inspections to check Lhe <br />quality or quantity of the Work, (2) reviewed construction <br />means, methods, techniques, sequences for the Contractor's <br />own Work, or procedures, (3) reviewed copies of requisitions <br />received from Subcontractors and material suppliers and other <br />data requested by the Owner to substantiate the Contractor's <br />right to payment or (4) ascertained how or for what purpose <br />the Contractor has used money previously paid on account of <br />the Contract Sure. <br />2.3.12 The Construction Manager shall review the safety <br />programs developed by each of the Contractors for purposes of <br />coordinating the saFety programs with those of the other <br />Contractors. The Construction Manager's responsibilities for <br />coordination of safety pro rams shall not wend to direct <br />control over or charge of the acts or omissions of the <br />Cant rac Lora, Subcontrac tors, agents or employees of the <br />Contractors or SubkcontraCtOrs,, or any other persons <br />performing portions of the Work and not directly employed by <br />the Construction Manager. <br />2.3.13 The Construction Manager .shall UnQQrtgkC _ <br />rQ a ,Sonp hla affnrf i g determine in geinertaill that the Work of <br />each Conitactor is being performed in accordance with the <br />requiremelits of the Cmract Docxi eats-, endeavoring to <br />guard the Owner against defects and deficiencies in the work. <br />612339e036 P.08 <br />As appropriate, the Construction Manager shall have authority. <br />upon written authoriaatiott from the Owner, to require <br />additional inspection or testing of the work in accordance with <br />the provisions of the Contract Docurnenm whether or not such <br />Work is Fabricated, installed or completed. The Cunstmction <br />Manager, in consultation with the Architect, eject <br />Work which does not conform to the requirements of the <br />Contact Documems unlegrz othe jpprgyed the <br />n r. <br />2.3.14 The Construdiort Manager shall schedule and <br />coordinate the sequence of construction in accordance with the <br />Contract Documents and the latest approved Project <br />construction schedule, <br />2.3.15 With respect to each ContraCtoes own Work, Lhe <br />ConsL ruction Manager shall not have control over or charge of <br />and shall not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions <br />and programs in connection with the Work of each of the <br />Contractors, since these are solely the Contractor's <br />respa ns ibility under the Contract for Construction. The <br />Construction Manager shall not be responsible for a <br />Contractor's failure to carry out the Work in accordance with <br />the respective Contract Documents. The Construction <br />Manager shalt not have control over or charge of acts or <br />omissions of the Contractors, Subcontractors, or their agents or <br />employees, or any other persons performing portions of the <br />Work not directly employed by the Construction Manager. <br />2 *3.16 The Construction Manager shall transmit to the <br />Architect requests for interpretations of the meaning and intent <br />of the Drawings and Specifications, and assist in the resolution <br />of questions that may arise. <br />2.3,17 The Construction Manager shall review requests for <br />changes, assist its negotiating Contractors' proposals, submit <br />recommendations to the Architect and Owner, aad, if they are <br />accepted, prepare Charge Orders and Cot truction Change <br />Directives which incorporate the architect's modifications to <br />the Documents. <br />2.3.18 The Construction Manager sliall assist the Architect in <br />the rcvicw, evaluation and documentation o f Clairns- <br />2.3.19 The Construction Manager shall receive certificaxes of <br />insurance from the Contractors and forward ilxein to the <br />Owner with a copy to the Architect. <br />2.3.20 In collaboration with the Architect, the Construction <br />Manager shall establish and implement procedures for <br />expediting the processing and approval of Shop Drawings, <br />Product Data, Samples and other submittals. The Construction <br />l winger shall review all Shop Drawings, Product Data, <br />Samples and other submittais from the Contractors. The <br />Construction Manager sha14 coordinate submittals with <br />information contained in related documents and transmit to <br />the Architect those which have been approved by the <br />onstructimi Mwiager. The Construction Manager's actions <br />shall be uken with such reasonable promptness as to cause no <br />delay in the Work or in the activities of the Owner or <br />Contractors- 4 <br />- OWNE R - CONSTRUCTION MANAGER AGREEMENT - 1991 EDITION - AIAQ - WARNING., Unlicensed photocopying violares U.s. copyright laws and <br />W;11 xu6ject }be v;olcitor to lepl prosecution. This documerxt was electronically produced with permission of the AIA and can be reproduced in <br />accordance w i; h your l i(erl Se wit f OUT V iola=ion until the dare of expiration as wed b -dow. expiration as noted below. User Document: 4W2(1)- <br />45UO)),aia -- 1130/2003. AIA License Number 1001863, which expires on 2/2/2003. <br />�Iecrronic formar D8011cma -1992 <br />