Laserfiche WebLink
III <br />Floor Drain Sump System Reilly Pl,um,b,ing <br />............................... <br />$18,963 <br />9 <br />Poll*cy ImpHeations: This building can, be brought back, to habitable standards, for approximately, <br />0 <br />$30,000. There are other Improvements necessary if the lower level, is going to be used for storag�e or <br />other purposes in the future. They include ventilated sto,ria,ge compartments,, a dehumidifier and fans to <br />keep air moisture to appropniate levels, and minor repairs to exterior w,al,lsi. We would estimate these <br />additional neceissary expenditures to cost less than $5,000. <br />Overall, this bui,ldin,g is a sound structure. with several, years of u,sieful life remaining on the current roof <br />The question is how it fits the long-terin, neieds, of the Fire Department and the City. <br />Hnancial Implicah"ons: These repairs could be funded by a budget amendment from the Building <br />Replacement Fund. 'rhis I's a dedicated fund for significant 'improvements to City facilities. <br />Staff Recommendation: As discussed staff feels the mold abatement and necessary repairs to Fire <br />Station #1 arie cost effective "if this structure fits a, long-term plan for the City facilities and City needs. <br />D <br />Until the C I ity moves forward with a plan to operate from, two, fire stations, for firie operations, it appears <br />A- <br />Lo be in the best 'interest of the City, to move forward with the repairs. Wei recommend that the blasie bid <br />9 <br />roof' repai I rs, and drain system repairs be completed as soon as practical. <br />mold abatement, 1, <br />Motion to amend the 2003 budget with an apipropn*'at,ion from the Building Replacement Fund 'in the <br />�mount of$30,000 for the purpose ofmoild abatement and repairs to F1 re Station 1 <br />