Laserfiche WebLink
Exhibit B <br />than 20 percent areal cover within the wet meadow ffinge; <br />4) a * ' of five or more native upland prairie plant species (indicative of the <br />installed native seed mix) must be dominant (see item I for dominance test <br />method) M' the upland seeding location. <br />-D <br />5) non-native or invasive species must comprise less than 20 percent areal cover <br />within the upland area; <br />6) all areas, in the wet meadow zone and upland zone must have a Bunn of <br />90% vegetated cover. <br />If after the end of the third grow m*g season, the vegetation does not meet the performance <br />standards as listed above, inspected and approved by the engineer,, the failing areas will be <br />revegetated or reseeded at the contractor's expense. Any reseeding/revegetating activities <br />must be approved by the engineer prior to installation. , <br />Exotic and invasive weeds shall be shall be controlled a mm'm"tum of 3 times per growing <br />season during the 60 month maintenance period M' the upland areas using an herbicide <br />application. Herbicide products and methods shall be submitted and approved by the <br />engineer prior to execution. <br />Areas where seeding, sodding or plants have not become successfully established or have <br />been choked out by exotic species, are dead, are in an unhealthy or unsightly condition or <br />have been destroyed by herbicide drift shall be replanted/re-seeded at the contractor's, <br />expense. <br />Warranty and maintenance work shall be considered as M'cidental to the project. <br />104.4, NATIVE PLANT INSTALLATION AND SEEDING (2571/2575) <br />The contractor shall not begin restoration activities prior to providing seed and plant tags <br />to the engineer and receivmg written or verbal approval to proceed. <br />All native seed mixes, shall conform to 1nDOT specification 3876 as amended and <br />described in Technical Memorandum No,. 09-03-ENV-011 for Pure Live Seed <br />requirements, labeling, cleaning, substitutions, and acceptable origin locations. <br />The contractor l"' is responsible for the successful establishment ofnative wetland vegetation <br />within the reconstructed wetland bas M'., The contracto r must provide original seed tags to <br />the engineer prior to installation of the native seed mix. Copies of seed tags or tags from <br />partial bags of seed are not acceptable and will not be eligible for payrwnt for native seed <br />material., <br />Broadcast Seeding.-W-eflands: <br />i <br />Seed' M9 shall occur before hydrology s restored to the wetland. <br />Wetland zones shall be seeded before July I st in the northern half of the state and June <br />I 5th in the southern part of the state. If this timeframe cannot be met, the seeding shall be <br />delayed until a seeding can be done after October 15th in the northern half of the state and <br />November I st in the southern half of the state. <br />Prior to seeding, topsoil shall be loosed to a minimum depth of inches unless there is a <br />6, <br />risk of erosion. <br />ROSEWOOD WETLAND AND MIDLAND HILLS ROAD <br />DRAINAGE IMPROVEMENTS <br />CITY OF ROSEVILLE PROJECT NO. ST-0843 <br />WSB PROJECT NO. 1797-�02 <br />SPECIAL PROVISIONS <br />Page 100-16 <br />