Laserfiche WebLink
I <br />u0 4.0 ZONING/PLANNED UNIT I)EVELOPMENT: <br />3 461 A PLANNED UNIT DEVELOPMENT is a zoning district which may include single or mixed uses, <br />,2 one or more lots or parcels, intended to create a more flexible, creative and efficient approach to <br />the use of the land subject to the procedures, standards, and regulations contained in the City <br />34 Code, The FINAL DEVELOPMENT PLAN process includes the consideration and approval of a set <br />of redevelopment plans and an agreement that stipulates the terms and conditions supported by <br />the City, <br />7 <br />would be from an existing SC, Shopping Center District <br />4.2 The REZONING of the subject property <br />to PUD, PLANNED UNIT DEVELOPMENT with an underlying zoning of SC, SHOPPING CENTER <br />40 DISTRICT. This rezoning is consistent with the Roseville Comprehensive Plan and its <br />4 designation of the parcel as Shopping Center. <br />1) 5.0 PROJECT 'SPECIFICS: <br />44Z 5.1 The Roundy's proposal seeks to redevelop the 7.7 acre mixed commercial property at 1201 - <br />4 5 1211, and 1215 Larpenteur Avenue into a 66,000+ sq. ft. Rainbow Foods grocery store <br />(including a drive-thru pharmacy, bank/financial institution, possible liquor store, and deli) an <br />44 7 open market structure (southwest corner) and a small coffee/caf6 type structure/use (southeast <br />44 corner) . <br />44 ' <br />50 5.2 The subject site includes three parcels of land, two owned by the Reinhart Real Estate Group, <br />5 Inc. and one by the City of Roseville (lift station) . The proposal seeks to raze the existing <br />52 grocery store, former craft store, Roseville 4 Theater, and the former Little Caesar's Pizza, and <br />replace them with a new Rainbow Foods store, a storm water management pond and open <br />5,4 market and a af6/coffee shop - Class I or 11 restaurant. <br />5 Ci, 5.3 The applicant is not proposing to subdivide or plat the property. Instead, each of theses new <br />57 areas (or redefined areas) would include a land lease, a practice that been used in other areas of <br />58 the city, typically on commercial and/or industrial zoned properties, and one similar to what is <br />5 occurring at Har Mar Mall. The City's parcel would remain. <br />1 5.4 The site will be lowered at the rear (north) and raised at the front (south) to create a gentler <br />2 slope and a parking area that is more pedestrian friendly. A retaining wall is designed at the <br />("JJ3 rear of the parcel to account for the flattening of the upper portion of the parcel. <br />5 5.5 The loading dock will be placed in the same generally located as the current facility and the <br />dock will not be enclosed. <br />7 <br />5.6 The site currently includes very little landscaping and no storm water management, both of <br />Yrw which will be added to the project creating a dramatic improvement over existing conditions. <br />70 Storm water management, will be incorporated into the site by a number of methods. In total <br />7 theses measures will ensure full compliance with City and Watershed requirements. <br />72 <br />21,0� <br />