My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0324_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0324_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2011 3:16:25 PM
Creation date
12/27/2011 2:15:48 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 8 7'.0 COMPLIANCE with ]L►WS and REGULATIONS: <br />129 7.1 The DEVELOPER represents to the CITY that any site improvements pursuant to the <br />130 proposed development will comply with all City, County, Watershed, Metropolitan, <br />131 State,, and Federal laws and regulations. <br />132 <br />133 8.0 SITE DEVELOPMENT REQUIREMENTS: <br />8.1 To ensure that the proposed development meets the CITY'S requirements and standards <br />for site development, the following provisions shall apply.- <br />a. Final Grading Plan. The final grading plan for each property and/or site must be <br />reviewed and approved by the Director of Public Works before any permits will <br />be issued. All grading shall comply with the approved grading plans and shall be <br />the responsibility of the DEVELOPER. The DEVELOPER's engineer shall <br />provide to the CITY a letter certifying that the grading project was constructed <br />and was completed as depicted in the approved grading plan prior to the issuance <br />of a Certificate of Occupancy. <br />b. Final Utility 'Yervicing Plan. The final utility servicing plan for each property <br />and/or site must be reviewed and approved by the Director of Public Works prior <br />to any permits being issued for the building. <br />C. Erosion Control, Prior to site grading, and before any utility construction is <br />commenced or building permits are issued, an erosion control plan must be <br />submitted for approval by the Director of Public Works and/or the Capitol Region <br />Watershed District,, and all erosion control actions shall be implemented, <br />inspected and approved by the CITY. <br />d. Clean Up. The DEVELOPER shall clean dirt and debris from public streets that <br />has resulted from construction work by said DEVELOPER or DEVELOPER'S <br />CONTRACTORS,, its agents or assigns. The CITY will determine whether it is <br />necessary to take additional measures to clean dirt and debris from the streets. <br />After 24 hours verbal notice to the DEVELOPER,, the CITY may complete or <br />contract to complete the clean up at the DEVELOPER'S expense. <br />e. Utility & Drainage Easements, The DEVELOPER is responsible for creating, <br />dedicating and/or granting specific easements pertaining to public utility services, <br />as approved by the City and/or storm water ponding and treatment as approved by <br />Capitol Region Watershed District. <br />V <br />
The URL can be used to link to this page
Your browser does not support the video tag.