My WebLink
|
Help
|
About
|
Sign Out
Home
2008_1013_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_1013_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:48 PM
Creation date
12/28/2011 11:52:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
more e'ffiiciie'n�t HVAC syste'rm. Chl aiir Bake�mlanI asked whe't he'r the buiiil�diinI g rmate'rilal�s wound be cormpatii bl�e <br />be'twe'e'n two facial iitiie's. Both projects wound use basiical l r the same rmate'riial�s. <br />Commissioner Feedback on proposed project <br />Diiscuissiion iin�cl�uide'd suipport of the overall project, an�d specific appre'ciiatiion for the use of permeable <br />pavers; statistics on the n�u mbe�r ®t contracts sii gn�e'd t ®r the co-op by Roseville re'siide'n�ts ve'rsuis those <br />from outside the cormrnuin�iity, with Mr. Hall advising that he diidn�"t have the iin�forrmatiion available ton�iighit, <br />bust couil�d e'asiil r obtaun iit from th�e'iir marketing de'partme'nt, and provide iit at the Pui bl�iic Hearing t ®r the <br />General Conce'pt Plan. Mr. Hall e'stiimate'd tIl at approximately fifty pe'rce'nt (50%) were Roseville re'siide'n�ts, <br />which made a substantial impact t® the com�m�uin�iity iin fre'e'iIn uip single-family Biome's t® you�nn ge'r fam�iil�ile's, <br />end broui gh�t additional stuide'nts unto the local school system. <br />Fuirth�e'r diiscuissiion iin�vol�ve'd the rationale end iin�fl�uie'nciin factors for Un�iite'd Properties iin melding the <br />buiiil�diin a co-op rath�e'r than con�dom�iin�iiuim uin�iits; with Mr. Hall addre'ssiin variiouis iIssule's and <br />consiide'ratiion�s iin that de'ciisiion�-melding, iin�cl�uidiin financing, with co-op buiiil�diin fiin�an�ce'd through a HUD <br />Master mortgage', with buiy-iin tiie'rs t ®r re'siide'nts, rath�e'r thl an individual mortgage's proce'sse's at a ban�k, <br />melding iit e'asile'r t ®r pe'ople', the incredible sense ®t com�m�uin�iity and owne'rsh�iip by re'siide'nts ®n <br />manage'me'nt boards end commiitte'e's t ®r ope'ratiIng the faciil�iity, rath�e'r than a full-time manage'me'nt <br />company; the pe'rce'ptiionn of con�dom�iin�ilulm�s iin the cuirre'nt market, with ove'rbuiill�diin iin the downtown� <br />areas, and lack ®t marketability ®t th�e'm at th�iis tiIme'; and the prime market ®t MN and the east cost t® the <br />uin�de'rstan�diin and acceptance of the co-op h�ou�siln plan. <br />Additional diiscuissiion iin�cl�uide'd con�fiirm�atiion that all de'l�iive'riie's and trash puck uip wou�l�d occuir iin the <br />base'me'nt le've'l, with n® outside struictuire's e'viide'nce'd; suipport t ®r pathway conne'ctii ons tr ®m the back t® <br />the e'xiIstiIng pathway sy'ste'm, and con�struictiion schedule that wound be de'pe'ndant ®n the municipal <br />approval proce'ss. <br />Commissioners overall offered th�e'iIr suipport t ®r the project as a nice addiitiion t® the ne'ii gh orh' ood; and <br />the positive appeal for people itn co-gips to re'm�aitn itn the same ne'il g Iii borh' ood wh�e'n ne'e'ditn to move on to <br />an assiiste'd l�iiviin faciil�iity. <br />Mr. Hall note'd that the entrance wound not joist serve the assiiste'd l�iiviin and co-op buiiil�diin ; buit signage <br />on Cle've'land wou�l�d denote iits use for access to Langton Lake Park, and tie unto the e'xiistiin g parkiin g lot <br />and Mouin�t Ridge e'ase'me'nt. Mr. Hall note'd thI at Brauin Intertech head al�re'ady comple'te'd some <br />environmental asse�ssm' e�nits, aned the+ 'ilr initial dentedente+ 'rm�ilni atilonis for e�nicapsu�l�atiIoni of asbe'stos m' ate�rilal�s priIor <br />t® de'm ol�iatia on ®t some ®r all ®t the three (3,) Biome's, and th�e'iIr iinte'nt t® buiiil�d the assiiste'd l�iiviin base'd ®n <br />market demand, with pre-selling re'q�uiiire'me'nts on�l r ne'e'de'd t ®r the co-op portiion ®t the project, with those <br />buiye'rs uisuial�l r able t® waist oust an e'nd produict, giIve'n th�e'iIr ne'e'd t® sell th�e'iIr e'xiIstiIng Dome's iin today 11s <br />h�ouisiin market. Mr. Hall iindiicate'd th�e'iIr preference t® buiiil�d both at the same tiIme', once th�e'y me't the <br />market, t ®r con�struictiion cost savings and less diisruiptiion t® the ne'ii gh�borh' ood. <br />
The URL can be used to link to this page
Your browser does not support the video tag.