Laserfiche WebLink
7.2 Based on a number of the points addressed in Section 5 (above) specifically that the Master Plan <br />99 identifies that subject property for multi family housing and a transition area from the single- <br />1 family residential to the north and the industrial uses to the south, and based on current <br />1 discussions pertaining to Roseville's Comprehensive Land Use Map update where the subject <br />1 property may be guided as High Density Residential, the Planning Division supports REZONING <br />1 4w. 3 the subject property from an existing R-1, Single Family Residence District to PUD,, PLANNED <br />1 ('_)4 UNIT DEVELOP MENT with an underlying zoning of R-3, GENERAL RESIDENCE DISTRICT. <br />11 o5 8.0 PROJECT SPECIFICS: <br />('_)6 8.1 The subject 6.35-acre property is currently two parcels with separate,, but related, owners. The <br />('_)7 site is currently a primarily wooded site with one single-family residence at its west end. There <br />are portions of two designated wetlands on the site (one on the north side of the property <br />includes 20,,301 sq. ft. of wetland area on the site and the other on the south side includes 905 <br />sq. ft. of wetland on the site) <br />11111 8.2 The proposal seeks to develop a 4-story, hipped roof, elongated 95-unit age-restricted <br />112 cooperative housing development located at the south end of the site and favoring the east side <br />113 of the property. Vehicle parking for residents will be provided underground at I space for each <br />114 of the 95 units. Variations in the building's facade have been designed to minimize the mass of <br />11 the structure,, and its placement to the very south of the parcel provides an appropriate <br />116 separation from the adjacent single-family residences. <br />11 "7 8.3 Access to the development will come from Cleveland Avenue North approximately mid-point <br />11 between County Roads C2 and D. The proposed primary access would serve four purposes; to <br />119 provide access to a below grade parking structure located beneath the building,, to access an at- <br />120 grade resident/guest parking lot, to provide access to the adjacent Langton Lake Park parking <br />121 lot,, and to provide for connections to future City roads. <br />122 8.4 Additional landscape considerations has been given to the north side of their property,, between <br />123 the street and the property line/existing trees. The Final Development Plan incorporates trees <br />124 and other landscaping to augment the existing condition to in the visual screen <br />125 from the proposed road and development. <br />12 6 8.5 Sidewalk and pathway have been incorporated into the development site to afford pedestrians <br />12 "7 access from Cleveland Avenue to the park. <br />128 8.6 The proposal would rely on existing public sanitary sewer and water located within the <br />129 Cleveland Avenue right-of-way, which design will be looped to eliminate dead end lines and <br />130 possible pressure losses. <br />131 8.7 The proposed Applewood Pointe site is required to create and manage its own storm water <br />132 according to City Code and the Rice Creek Watershed. Efficiencies and better utilization of the <br />133 land has been achieved under the current design, though given the remoteness of this site to the <br />134 broader Twin Lakes redevelopment area, its design achieves a site specific efficiency. <br />Page 4 of 7 <br />