Laserfiche WebLink
44 POLICY OBJECTIVE <br />The proposed project an�d the use of profession l services/en�gin�eers are <br />consistent with City policy an�d practice for repairs/ren�ovation�s/con�struction that is <br />necessary for the City infrastructure. <br />The proposed project considers Imagine Roseville 2025 initiatives. <br />FINANCIAL IMPLICATION <br />The proposal to con�duct further study an�d analysis of the campus is $,24,,8,00, <br />plus reimbursable travel an�d production expenses. <br />The proposal to provide design an�d construction management services is <br />$112,8,00, plus reimbursable travel an�d production expenses. <br />COUNCIL ACTION REQUESTED <br />1., To ratify previous action authorizing the City hanger to enter into an <br />agreement with Ka rges- Fau Icon bridge, Inc., (KFI for master plan study <br />services as outlined at a cost of $,24,,8,00 plus reimbursable travel an�d <br />production expenses. <br />2. To ratify previous action cut orizin�g thie City Man�ager to enter into an <br />agreement with Merges-Faulcon�bridge, Inc., (KFI for the design an�d <br />construction management services at a cost of $112,8,00, plus <br />reimbursable travel an�d production expenses to install a "full", geothermal <br />system in the Roseville Skating Center Arena based upon a "best value", <br />contracting approach as outlined. <br />2 <br />