My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0225_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0225_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:50 PM
Creation date
12/29/2011 8:38:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Duane Schwartz <br />City of Roseville <br />Proposal for Engineering Services - 2008 Watermain Lining Project <br />February 21, 2008 <br />Page 3 <br />4. Conduct field surveys at proposed exc�ava,tion sites. Up to 1.2 hours survey crew <br />time for surveying at the excavation sites is included. Additional survey time <br />required shall be Additional Services. <br />5. Advise the OWNER as to the necessity of the OWNER providing or obtaining <br />data or services from others, and act as the OWNER's representative in <br />connection with any such services., <br />6. Prepare for incorporation into the Contract Documents final plans and <br />specifications setting forth in detail the requirements for the construction of the <br />Project. <br />7. Assist the OWNER in connection with their responsibility for filing doicurnents <br />required for the approval of governmental authorities having Jurisdiction over, the <br />Project. <br />8" Prepare and furnish an opinion of probable consitructioln costs biased on the plans <br />and specifications. <br />9. The Project will be bid and constructed under two prime construction contracts. <br />Prepare for review and approval by the OWNER, their legal counsel and other <br />advisors contract agreement forms,, general conditions,, supplementary conditions, <br />bid forms invi 1 ns to bid and instructions, to bidders', and assist in the <br />taflo <br />preparation of other related documents for each construction package., <br />10. Identify for the OWNER, their legal counsel and other advisors the necessary <br />easements and right-of-way to construction the Project, based upon property, <br />easement, and right-of-way surveys provided by the OWNER. <br />11. Furnish five sets of the documents specified in SECTION ILA.91 to the OWNER. <br />Conduct a final review meeting with the OWNER and make minor, revisions and <br />adjustments. <br />B. BIDDING PHASE <br />1. Coordinate the bidding dates to occur on the same day for each of the lining <br />projects from the various cities. <br />2. Reproduce final bidding documents and related contract forms, for bidding and <br />construction purposes. <br />3. Prepare an advertisement for bids to be submitted by the OWNER for publication. <br />4. Assist the OWNER in obtaining bids for two prime construction contracts., <br />
The URL can be used to link to this page
Your browser does not support the video tag.