My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0225_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0225_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:50 PM
Creation date
12/29/2011 8:38:51 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Duane Schwartz <br />City of Roseville <br />Proposal for Engineering Services - 2008 Waterman Lining Project <br />February 21, 2008 <br />Page 4 <br />5. Prepare tabulation of bids received. <br />6. Assist the OWNER in evaluating the bids and in assembling and awarding the <br />construction contracts. <br />If the need for Additional Services is determined, and the fee for the additional work is agrecablc <br />and the OWNER authorizes such services in writing, T'KDA shall furnish or obtain from others <br />services of the types listed below. Additional Services shall be billable on an Hourly Rate basis <br />as defined in Article 3 of the General Provisions', and such billings shall be over and above any <br />maximum amounts set forth in this Proposal. <br />A. Investigations of existing conditions or facilities or to, make measured drawings, thereof, <br />or to verify the accuracy of drawings or other information furnished by the OWNER <br />and/or utility companies. <br />Services resulting from significant changes in extent of the Project or its design <br />including, but not limited to, changes in size, complexity, the OWNER's schedule, or <br />character of construction or methods of financing,, and revising previously accepted <br />studies, reports, design documents or Contract Documents when such revisions are due to <br />causes beyond TKDA's control. <br />C. Services in connection with change orders provided such change orders are required by <br />causes not solely within the control of TK ; services after the award of each contract in <br />evaluating substitutions proposed by the contractor(s); and in making revisions to plans <br />and specifications occasioned thereby, and services resulting from Significant delays,, <br />changes or price increases occurring as a direct or indirect result ofmaterial, equipment <br />or energy shortages. <br />D. Preparing for OWNER, on request, a set of reproducible record prints of' plans showing <br />those changes made during the construction process, based on the marked-up prints,, <br />drawings and other data furnished by the contractors) to 'TKDA and which TKDA <br />considers significant. <br />E. Construction Phase services, including: <br />1. Construction Contract Administration <br />a. Consult with and advise the OWNER and act, as the OWNER's <br />representative as provided in t: e Contract Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.