Laserfiche WebLink
Attachment J <br />I Developer shall repair or replace as directed by the City and at the Developer's sole cost and <br />2 expense.- (i) any and all faulty work, (ii) any and all poor quality and/or defective materials, and (iii)i <br />3 any and all trees, grass and/or sod which are dead, are not of good quality and/or are diseased, all <br />4 being as determined in the sole but reasonable opinion of the City or its Engineer, provided the City <br />5 or its Engineer gives notice of such defect to Developer on or before 60 days following the <br />6 expiration of the two year warranty period. The Developer shall post maintenance bonds or other <br />7 security acceptable to the City to secure the warranties described herein. <br />8 L. Utility Company Improvements. The Developer shall install and pay for all utility improvements <br />9 necessary to serve the Property, including gas, electric, and telephone service, which shall be <br />10 installed by the appropriate utility company at the direction of the Developer. All utilities shall be <br />I I installed underground. The Developer shall arrange for the installation of underground gas, electric, <br />12 telephone and cable television before the final lift is started. <br />13 M. Park Dedication Fee. The park dedication fee for this Plat shall be $,84,000 and shall be paid to the <br />14 City of Roseville upon or prior to the execution of this Agreement. <br />15 N. License. The Developer hereby grants the City, and its agents, employees, officers and contractors a <br />16 license to enter the Property to perform all work and inspections deemed appropriate by the City. <br />17 The license shall expire after the Plat has been completely developed. <br />18 0. Building Permits. In order to provide emergency vehicle access, a passable Class 5 road base must <br />19 be extended to within 150 feet of any address seeking a building permit. Breach of the terms of this <br />20 Agreement by the Developer shall be grounds for denial of building permits, including lots sold to <br />21 third parties. <br />22 P. Land Occupancy. No certificate of occupancy shall be issued until: <br />23 1. Curb and gutter and bituminous surfacing at least the first lift), are installed and <br />24 approved by the City Engineer. <br />25 2. The installation of a hard surface driveway and parking lot. <br />26 3. The installation of the appropriate ground cover. <br />27 Q. Construction Management. The Developer and its contractors and subcontractors shall minimize <br />28 impacts from construction on the surrounding neighborhood as follows.- <br />29 1. Definition of Construction Area. The limits of the Project Area shall be defined with <br />30 heavy-duty erosion control fencing approved by the City Engineer. Any grading, <br />31 construction or other work outside this area requires approval by the City Engineer and <br />32 the affected property owner. <br />33 2. Parking and Storage of Materials. Adequate on-site parking for construction vehicles and <br />34 employees must be provided or provisions must be made to have employees park off-site <br />35 and be shuttled to the Project Area. No parking of construction vehicles or employee <br />36 vehicles shall occur along County Road C-2, Lexington Avenue, Josephine Road or <br />37 Fernwood Street outside of the Plat boundaries. No fill,, excavating material or <br />38 construction materials shall be stored in the public right-of-way. <br />39 3. Hours of Construction. Hours of construction,, including moving of equipment shall be <br />40 limited to the hours between 7 a.m. and 9 p.m. on weekdays and 9 a.m. and 9 p.m. on <br />41 weekends. <br />Page 7 of 15 <br />