Laserfiche WebLink
:i' /,.:: •; r s -:''.. �� 'SL'''Y <br />MECHANICAL <br />+�� i nnn •u.ri. n.. .i nn�.�nri.i. �.�ir ��� <br />Col � rF T ACTT G <br />1600 ISM' Avenue NE E Phone (507) 437-8201 <br />Po Box 277 Fax (507) 437 +8378 <br />Austin, MN 55912 <br />www.hartymechanical.com <br />2) This will not impact the construction schedule. <br />Risk ##7 Specified light fixtures may become damaged during the required removal, storage and <br />reinstallation. Specified light f Lures may require repair or service to ensure optional <br />operation- upon reinstallation. <br />Plan to Minimize Document any existing problems with any reinstalled equipment before demolition <br />phase. Electrical contractor shall notify Harty Mechanical if ` a fixture cannot he removed <br />without being damaged. <br />1 ) obtain quote from electrical contractor to replace the future. <br />2) The change order would be the responsibility of the City of Roseville. <br />3 ) This will not affect the construction schedule. <br />If fixture i s damaged during construction and damage is a result of contractor error, the <br />following will occur: <br />1) Contractor responsible for the damage to the fixture shall replace fixture. <br />2) This will not impact construction costs or construction schedule. <br />Risk #8 working in and around occupied areas of the ice arena. l oanal working hours 7:00 AM <br />to 4:30 PK th -i s may cause disruption to ice arena staff and patrons. <br />Plan to Minimize Reviewed with the City of Roseville. City of Roseville will notify all staff. We can lock <br />al] doors if needed. This will not impact the construction schedule or construction costs. <br />Risk #9 Drilling of anchors to support conduit and equipment mounting struts and all required <br />wall penetrations may interfere w1th c j sti g structural and mechanical equipment <br />systems. <br />Plan to Minimize This would be a risk that is not controlled. If this problem occurs the following will take <br />place: <br />1) Contractor shall notify Larry Mechanical in a RFl form stating the problcm, <br />2) Marty Mechanical shall forward RFI to Fl. <br />3) K`I shall respond with solution that will minimize construction costs and the <br />construction schedule. <br />Risk #10 Disposal of existing wire, piping and all associated mounting brackets and hardware that <br />are demolished. <br />Plan to Minimize Harty Mechanical is responsible for the disposal of all demolished equipment that is <br />listed on plans. This will net impact construction costs or construction schedule. <br />