My WebLink
|
Help
|
About
|
Sign Out
Home
2008_0609_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2008
>
2008_0609_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2012 1:34:53 PM
Creation date
12/29/2011 3:25:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL <br />CONTRACTING <br />1600 1ST Avenue NE <br />Igo Box 277 <br />Austin{ MN 55972 <br />Phone (507) 437 -8201 <br />Fax (507) 437 -8378 <br />www.hartymechanical.com <br />Risk #17 The schedule is very compact and does not leave any room for unexpected delays . <br />Plan to Minimize This is a n*sk that is not controlled. Update schedule weekly to keep up to date on delays. <br />Iv Detailed list of all client risks and concerns, <br />Need from the City of Roseville <br />V Detailed list of all risks that the vendor does not control, <br />Risk ##1 Depth of under ice heat is unknown. <br />Plan to Minimize Test at start of project. Need to verify that heat piping is not below vE depth changes <br />If existing heat piping is within excavated m ateri al, it will not impact construction price <br />or construction schedule. If piping is below excavated depth. we shall abandon and cap in <br />place. <br />1 tf 9FiAX <br />Plan to M inimize <br />If heat piping is not within excavated material, the following will take place: <br />1 ) price for removal and installation of new sand will be 70 /cubic yard. <br />2) The associated delays will be determined based on the additional amount of excavation <br />necessary. The project delay and related costs will be the responsibility of the City of <br />Roseville. <br />There are no soil burin las for well field area. <br />asphalt may be different than the anticipated }' <br />base different than needed., sub-soils that ark <br />Unknowns include follow: Thickness of <br />depth or adequacy of the existing Class 5 <br />f structurally inadequate, contaminated, <br />require rock excavation or a high water table. The correction of the mentioned items or <br />excessive rain delays would require overtime expense to maintain the very tight schedule <br />for this area. <br />F I would need to verify borings as soon as possible. If there is a problem the following <br />will take place: <br />
The URL can be used to link to this page
Your browser does not support the video tag.