Laserfiche WebLink
CASE NUMBER: 1361-82 <br />APPLICANT . Hoffman Electric Company <br />Page 2 <br />The principal structure has 50, 000 square feet with at least two stories,, <br />with the office above and their contract operations on the lower floor+ <br />Their lower floor orients entirely to the north, fronting on a service <br />court totally enclosed by their covered storage facility and garage space <br />along the north side of the property, and brick walls enclosing the <br />remainder of the area (except for entrance points as required by the P -4 <br />Zoning District). These openings, of which there are two, will have <br />sliding gates so as to totally enclose the service area on the north side <br />of the principal building. The applicants are seriously considering <br />building .a third floor at this time, leaving this space unused until <br />required for their anticipated expansion within five years. They propose <br />to bid the construction of the third floor shell as an alternate, therefore, <br />the decision to provide for this third floor facility has not yet been <br />made. <br />The plans indicate an option for expansion on the east and west ends of the <br />principal building for an additional 15,000 square feet. The site plan <br />includes adequate parking and expansion for initial construction and proposed <br />expansion <br />4. The building materials will be brick (or equivalent masonry unit) and a <br />pre -cast "sandwich"' panel system known as "Dryvi t Wall Panel". This <br />material has a textured masonry surface fabricated with an insulating <br />panel. A sample of the material will he shown at the Planning Commission <br />and council hearings. <br />5. The accessory garage and indoor storage area (permitted as an-accessory <br />use in the District) is proposed to be located along the north line of <br />the property within five feet of the property line. The rear wall of this <br />structure is substantially below grade and is contiguous to the truck <br />loading area behincl the Roberts warehouses to the north. They are asking <br />for a variance from the ten foot setback required for this accessory <br />building to five feet. In effect, this allows them to place the entire <br />set of structures five feet further distance from the Trunk Highway 36 <br />Service Road. We believe this variance merits serious consideration <br />inasmuch as they are making every attempt to retain as many trees as <br />possible in the front yard contiguous to the service road. The Ordinance <br />requires the parking in the Front yard to be at least 50 feet from the <br />front property line. The plans indicate this parking to be set hack <br />81.54 feet (at the nearest point) and 95.54 feet for the easterly-most <br />parking area in the front. The structure is required, to be set back 100 <br />feet and is, in fact, set hack 165 feet at its nearest point. Thus, they <br />are substantially increasing the required setbacks in the interest of <br />maintaining as many trees as possible, and providing a "pleasing" front <br />yard environment_ <br />6. With respect to storm sewer drainage, the staff has consulted with the <br />Rice creek watershed people and have preliminary approval to collect the <br />