Laserfiche WebLink
ZEN 0 <br />AGENDA SECTION'. ORIGINATING DEPT. /DIV.. <br />REPORTS AND RECOMMENDATIONS <br />PUBLIC-WORKS <br />- --------------------------- <br />ITEM DESCRIPTION. RECEIPT OF BIDS FOR PROJECT P-82-17, <br />FULHAM ST=: AND ST-82-18, FULHAM STORM DRAiNs <br />'AEETJN(-; <br />DATE: <br />7 AM <br />re M, 7J 3 rk on <br />On Sept, 10, 1982 e <br />the city receivd b'ds <br />I I <br />dn two improvWxnent projects, <br />These were for the construction of Fulham <br />Street from Termlnal Road to <br />the T.H. 36 frontage road, designated as Project <br />P-82-179 <br />and for the <br />construction of storm drainage along the T.H.36 <br />frontage <br />road east of <br />Fulham pond, designated as ST-82-18, The <br />results of the <br />bidding are <br />as follows: <br />TOTAL BID AMOUNT <br />SECTION 1 <br />SECTION 2 <br />C, S McCROSSAN $ 19 7 10 9-0-1-0-0 <br />s-900,910. <br />- -0 -M <br />$ 10,6 <br />Austin P. Keller 201,051"00. <br />971,272 <br />1031779 <br />Arcon Construction 209F512*65 <br />100r893 <br />108F618 <br />Total Asphalt 209r690,00 <br />980,11.0 <br />111,580 <br />Alexander Construction 215,905,45 <br />105y288 <br />110.r616 <br />ROSO Contracting - 221,47lo5O <br />105,931 <br />115F540 <br />Moore Company 224,357,50 <br />109,697 <br />114F630 <br />As you can see, C, S. McCrossan, Inc., was <br />the low bidder <br />with a total <br />kid of $197,090.00. This is slightly less <br />I <br />than the engine'er's <br />esti- <br />mate for these improvements, The contractor's <br />credentials <br />have been <br />reviewed, and he is found to be acceptable <br />for award, .. <br />RECOMMENDED ACTION: Adoption of a resolution accepting the bid of <br />C. S. McCrossan, Incorporated, of $197?090,00 <br />for Projects P-82-17 Fulham Street, and St-82-18, <br />Fulham Storm Drains; designated as Secti6n 1 and <br />Section 2 of the 1982 Irnprovementst Contract E. <br />