My WebLink
|
Help
|
About
|
Sign Out
Home
2012_0409_Packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2012
>
2012_0409_Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2012 3:24:08 PM
Creation date
4/5/2012 4:22:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contractual concrete work that fall within budget guidelines. This allows maintenance programs <br />15 <br />to be completed as planned with quality materials at the lowest possible cost to the city. <br />16 <br />17 <br />FI <br />INANCIALMPACTS <br />18 <br />Street maintenance materials and contractual concrete curb work are funded in the street <br />19 <br />maintenance budget. Concrete sidewalks and panels are funded in the Pathway Parking Lot <br />20 <br />budget. The concrete compost bin is funded in the Storm Sewer Utility budget. The bids <br />21 <br />received are reflective of current market rates. <br />22 <br />SR <br />TAFF ECOMMENDATION <br />23 <br />Staff recommends award of the low bid in categories as listed. <br />24 <br />RCA <br />EQUESTEDOUNCILCTION <br />25 <br />26 <br />Motion accepting the following bids for street maintenance materials and contractual work: <br />27 <br />1. Class 5 aggregate base Aggregate Industries <br />28 <br />2. Concrete panels, curb, and sidewalk Ron Kassa Construction, Inc. <br />29 <br />3. Concrete Bin at Compost Site Landmark Construction <br />30 <br />31 <br />Prepared by: Steve Zweber, Street Supervisor <br />Page 2 of 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.