Laserfiche WebLink
contractual concrete work that fall within budget guidelines. This allows maintenance programs <br />15 <br />to be completed as planned with quality materials at the lowest possible cost to the city. <br />16 <br />17 <br />FI <br />INANCIALMPACTS <br />18 <br />Street maintenance materials and contractual concrete curb work are funded in the street <br />19 <br />maintenance budget. Concrete sidewalks and panels are funded in the Pathway Parking Lot <br />20 <br />budget. The concrete compost bin is funded in the Storm Sewer Utility budget. The bids <br />21 <br />received are reflective of current market rates. <br />22 <br />SR <br />TAFF ECOMMENDATION <br />23 <br />Staff recommends award of the low bid in categories as listed. <br />24 <br />RCA <br />EQUESTEDOUNCILCTION <br />25 <br />26 <br />Motion accepting the following bids for street maintenance materials and contractual work: <br />27 <br />1. Class 5 aggregate base Aggregate Industries <br />28 <br />2. Concrete panels, curb, and sidewalk Ron Kassa Construction, Inc. <br />29 <br />3. Concrete Bin at Compost Site Landmark Construction <br />30 <br />31 <br />Prepared by: Steve Zweber, Street Supervisor <br />Page 2 of 2 <br /> <br />