Laserfiche WebLink
StaEion Location, Apparaius, and Staffing Analysis <br />Rosevi]Ie, MN <br />Once the decision to add, consolidate, or rebuild a station has been made and the site(s) <br />selected, the process moves on to determ�ining the size of each sta,tion---how many units and <br />people should it be designed to house? <br />While an architect will woxk with the department to determine the exact size and layout <br />of a new station, there are some basic factars a departtnent should considcr from the bcginning: <br />1. How many units will need to be housed at the station during its lifetime? (Apparatus <br />bays typically make up the laz�gest portion of a fire starion.) <br />2. How many personnel will staff the units? <br />3. What facilities will tk►ey need {sleeping quarters, parking, fitness facilities, etc.)? <br />4. Will additional units and personnel need to be housed at the station in the foreseeable <br />future? <br />5. Will other organizations share space in the structure (Police Department, Municipal <br />Offices, etc.)? <br />6. How many of�ices are needed? <br />7. Do we want a community space for the public? <br />8. How big axe the available lots in the area the station will go? <br />Although not done as part of this study, comparisons can be made with other departments <br />and the size of their stations to get an idea of bow much space will be needed. <br />When prioritizing rcpairs or renovations in an existing station, an initial screening shauld <br />be done to determinc the long-term viability of the facility. It is important to know whether the <br />facility will be useful from a system-wide operational standpoint beyond its expected useful <br />Iifecycle. If a facility will be unnecessary from a service delivery viewpoint before it wouid need <br />replacement or major renovation, then it is not worth doing much repa�r work to it. That is, if the <br />station will need only minor repairs for the next 5 years but major renovation in 6 years but the <br />station will not be needed after 3 years because a new one will be opening up down the road, <br />then it does not make sense to make major repairs or renovations to the building. <br />The next consideration is how long it wil� take to provide a suitable replacement if one is <br />needed. If a station needs to be relocated, how long will it be before the replacement station is <br />ready for occupancy? It may be appropriate to only make temporary or relatively minor repairs <br />until the move to the new station is completed. If the delay in opening a new station is going to <br />be lengthy, mare of the necessary repairs should be made in the interim. <br />System PIanning Corporation 15 Nlay 2U08 <br />TriData Division <br />