Laserfiche WebLink
block is porous, and the Minnesota freeze and thaw cycles causes the block to spall and water <br />to enter the building, causing moisture and mold issues. <br />The committee felt the building was too small to provide current or future fire ser�ice <br />operations, e�en considering the fact the building was remodeled in 2001 to add dorms and an <br />upstairs restroom. <br />Decision #2 <br />The right number of fire stations needed to provide current <br />and future service to the community. <br />The committee examined how current services are provided and how future service impacts <br />may affect the space and location needs of the department. After extensive examination of the <br />current staffing model, the committee concluded that for the foreseeable future, the needs of <br />the community could be provided utilizing the same or like staffing model. The current stafFing <br />model provides 24/7 fire & medical coverage utilizing an on-duty crew of between 4-6 <br />firefighter/EMT's, working out of one fire station. <br />The committee then looked at how the number of fire stations would positively or negatively <br />impact the fire departments current exceptional response time. Given the fact that more than <br />99% of calls for service are provided from fire station #3, located on Dale Street just north of <br />Highway 36, the committee decided to focus on this locatian as a comparison for response time <br />impacts. The committee reviewed response time grids from each of the three current fire <br />station locations and frorn potential future fire station locations. The committee concluded <br />that the fire department currently experiences an exceptional response time, responding from <br />fire station #3, which is positioned well using a north/south grid of the city, but is <br />disadvantaged using an east/west grid of the city, positioning significantly east of city center. <br />The committee then examined the current and future space needs of the department. The <br />committee concluded that none of the current stations met the needs of the department and <br />more space would be needed. The total usabfe accumulative space of the three current fire <br />s#ations is approximately 24,000 square feet. <br />The committee decided that given the current usable space of approximately 24,OQ0 square <br />feet, and planning for future departmental needs, that a bench mark of 34,000 to 36,000 <br />square feet would be needed for a one fire station operation. <br />11 <br />