My WebLink
|
Help
|
About
|
Sign Out
Home
CC_Minutes_2007_0312
Roseville
>
City Council
>
City Council Meeting Minutes
>
200x
>
2007
>
CC_Minutes_2007_0312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 9:45:18 AM
Creation date
3/28/2007 11:12:41 AM
Metadata
Fields
Template:
Roseville City Council
Document Type
Council Minutes
Meeting Date
3/12/2007
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Regular City Council Meeting <br />Monday, March 12,2007 <br />Page 10 <br /> <br />Base Bid: <br />Lump sump for all labor, materials, equipment, and services necessary for <br />and incidental to the construction of the Roseville Skating Center south en- <br />tryway addition and remodeling project <br /> <br />Alternate #1: <br />Revising the main roof structure to be constructed with pre-engineered <br />wood, scissor trusses, 5/8" plywood sheathing, 12' fiberglass batt insulation, <br />and 5/8" gypsum board with a vapor retarder in lieu of the proposed steel <br />beam, deck and insulation panel <br /> <br />Alternate #2: <br />Add the basement space under the new main lobby floor <br /> <br />Alternate #3: <br />Delete the sheet metal roofing and install asphalt shingles and delete the <br />sheet metal siding and install l' stucco over specified sheathing <br /> <br />Alternate #4: <br />Add additional rubber flooring <br /> <br />Alternate #5: <br />Add automatic door openers to the south entryway doors, including push <br />button bollards; also to include automatic door openers to the northern most <br />door of the north entrance to the banquet center entrance <br /> <br />Alternate #6: <br />Add solid surface counter tops in lieu of plastic laminate over particle board <br /> <br />Alternate #7: <br />Delete the exterior brick veneer and substitute "rock face' concrete block <br />veneer for all exterior walls of the addition <br /> <br />Alternate #8: <br />Add slab tubing, piping, and controls to heat the entrance stoop, steps and <br />sidewalk area <br /> <br />Alternate #9: <br />Add cost of restroom remodeling project <br />
The URL can be used to link to this page
Your browser does not support the video tag.