My WebLink
|
Help
|
About
|
Sign Out
Home
2012-10-23_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2012
>
2012-10-23_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2012 2:44:41 PM
Creation date
10/18/2012 2:40:37 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
10/23/2012
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roseville Public Works, Environment and <br />Transportation Commission <br />Agenda Item <br />Date: October 23, 2012 Item No: 7 <br />Item Description: County Road D Reconstruction Design <br />Background: <br />The Roseville City Council authorized the preparation of a Feasibility Report for County Road D <br />(Lexington Ave to Victoria Street) Reconstruction project on June 11, 2012. Construction is <br />proposed for 2013. In the last 6 months, city staff has held 2 public information meetings with <br />residents living along County Road D. The first meeting was on August 6, where we presented <br />the proposed reconstruction project and received input regarding neighborhood concerns along <br />the corridor. Among these were: Street design, parking, the need for a south side sidewalk, and <br />traffic, <br />The second meeting was on October 4, where we showed the residents a proposed street design. <br />This design included a 6 foot wide detached concrete sidewalk along the south side of the street, <br />along with a parking lane along the north side of the street for the entire corridor. <br />On October 27, we will have a "walk thru" meeting on site. This meeting will start at Lexington <br />Ave and will continue east toward Victoria Street. It will be a meeting in motion. The City <br />surveyor marked the location of the new curb and sidewalk allowing staff to be able to meet with <br />residents individually to discuss the project and show them how it would impact the right of way <br />in front of their property. <br />Our final information meeting will be on November 29. At that meeting, we will present the <br />preliminary staff recommendations including project cost and proposed assessments for the <br />proj ect. <br />The Feasibility Report will be presented to the City Council in December, with a Public Hearing <br />in January 2013. Staff will walk through the preliminary plans at the meeting next week. <br />Recommended Action: <br />Discuss County Road D Reconstruction project. <br />Attachments: <br />A. None <br />
The URL can be used to link to this page
Your browser does not support the video tag.